PENJADWALAN MESIN SCREW PRESS STASIUN KEMPA PADA PRODUKSI CPO (CRUDE PALM OIL) DAN KERNEL DENGAN MENGGUNAKAN METODE INDIKATOR

Complex problems often encountered in the company, especially the production. The company should be able to increase production capability by increasing the utility of existing resources and accuracy in the completion of production to match the deadlines set by scheduling planned well. As a compan...

Full description

Bibliographic Details
Main Author: Heri Wibowo
Format: Article
Language:English
Published: Industrial Engineering Department Faculty of Industrial Technology Universitas Ahmad Dahlan 2016-04-01
Series:Spektrum Industri: Jurnal Ilmiah Pengetahuan dan Penerapan Teknik Industri
Subjects:
Online Access:http://journal.uad.ac.id/index.php/Spektrum/article/view/3703/1992
Description
Summary:Complex problems often encountered in the company, especially the production. The company should be able to increase production capability by increasing the utility of existing resources and accuracy in the completion of production to match the deadlines set by scheduling planned well. As a company produces CPO and kernel continuously so the scheduling screw press machine should be well planned so that production can be completed on time, damage to the engine and overtime can be avoided. This study aims to analyze the utilization schedule and screw press machine at the station felt that optimal production can be achieved and determine the cause of the delay production time resulting in overtime. The method used is the method of indicators that can be applied to the machine which is parallel with different capacities. This method minimizes the turnaround time by prioritizing machine with a large capacity while maintaining the efficiency of the engine and the completion time has been determined. Proposed scheduling using indicators generate optimal schedule, 13840 hours of work available only used 12373.5 hours with five machine screw press, the clock difference is 1408.5 hours of work hours are unemployed and 58 hours of treatment machine screw press, and produce five utilities screw press machine on average up to 89.40% and utilities average every month five screw press machine is 89.46%. The delay time of CPO production process and the kernel has been caused by damage to machine screw press which occur during the production process takes place so that if the production capacity is reduced and overtime hours cannot be avoided. Screw press machine maintenance can be done by the engine maintenance schedule time without having to wait for the machine was broken beforehand and this can reduce the cost of production.
ISSN:1693-6590
2442-2630