Project risk management in the construction of high-rise buildings
This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analys...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20183303074 |
id |
doaj-c0a7c72202784bccbd91bdaa2bf75aa7 |
---|---|
record_format |
Article |
spelling |
doaj-c0a7c72202784bccbd91bdaa2bf75aa72021-04-02T15:39:39ZengEDP SciencesE3S Web of Conferences2267-12422018-01-01330307410.1051/e3sconf/20183303074e3sconf_hrc2018_03074Project risk management in the construction of high-rise buildingsTitarenko BorisHasnaoui AmirTitarenko RomanBuzuk LiliyaThis paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric “contamination” was developed.https://doi.org/10.1051/e3sconf/20183303074 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Titarenko Boris Hasnaoui Amir Titarenko Roman Buzuk Liliya |
spellingShingle |
Titarenko Boris Hasnaoui Amir Titarenko Roman Buzuk Liliya Project risk management in the construction of high-rise buildings E3S Web of Conferences |
author_facet |
Titarenko Boris Hasnaoui Amir Titarenko Roman Buzuk Liliya |
author_sort |
Titarenko Boris |
title |
Project risk management in the construction of high-rise buildings |
title_short |
Project risk management in the construction of high-rise buildings |
title_full |
Project risk management in the construction of high-rise buildings |
title_fullStr |
Project risk management in the construction of high-rise buildings |
title_full_unstemmed |
Project risk management in the construction of high-rise buildings |
title_sort |
project risk management in the construction of high-rise buildings |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2018-01-01 |
description |
This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric “contamination” was developed. |
url |
https://doi.org/10.1051/e3sconf/20183303074 |
work_keys_str_mv |
AT titarenkoboris projectriskmanagementintheconstructionofhighrisebuildings AT hasnaouiamir projectriskmanagementintheconstructionofhighrisebuildings AT titarenkoroman projectriskmanagementintheconstructionofhighrisebuildings AT buzukliliya projectriskmanagementintheconstructionofhighrisebuildings |
_version_ |
1721559485467590656 |