Operation of Norwegian Hydropower Plants and Its Effect on Block Fall Events in Unlined Pressure Tunnels and Shafts
The main objective of this study is to investigate the effect of hydropower plant operation on the long-term stability of unlined pressure tunnels of hydropower plants in Norway. The authors analyzed the past production data of some hydropower plants to find out the number of starts/stops and the fr...
Main Authors: | Bibek Neupane, Kaspar Vereide, Krishna Kanta Panthi |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-06-01
|
Series: | Water |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-4441/13/11/1567 |
Similar Items
-
Retrofitting of Pressurized Sand Traps in Hydropower Plants
by: Wolfgang Richter, et al.
Published: (2021-09-01) -
Efficiency of Pressurized Rock Traps for Unlined Hydropower Tunnels
by: Ola Haugen Havrevoll, et al.
Published: (2021-07-01) -
Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects
by: Chhatra Bahadur Basnet, et al.
Published: (2018-06-01) -
Scour of unlined dam spillways
by: Sawadogo, Ousmane
Published: (2010) -
Experimental and Numerical Determination of the Head Loss of a Pressure Driven Flow through an Unlined Rock-Blasted Tunnel
by: Jochen Aberle, et al.
Published: (2020-12-01)