PERAWATAN HOIST CRANE DENGAN METODE MAINTAINABILITY DAN COSTING UNTUK MENGURANGI BREAKDOWN
Abstract PT. ABC is a manufacturing company in the field that requires a crane hoist readiness in every production, with an average of 42.92 hours a breakdown, the necessary methods of treatment that effectively and efficiently, with a critical component bearing, gear, wheel trolley, wire rope, shaf...
Main Authors: | Andy Hardianto, Pratikto Pratikto, Lilis Yuliati |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2015-09-01
|
Series: | Journal of Engineering and Management in Industrial System |
Subjects: | |
Online Access: | https://jemis.ub.ac.id/index.php/jemis/article/view/165 |
Similar Items
-
Kinetic Analysis of Four-link Gantry Crane Hoisting System
by: Fan Si Li, et al.
Published: (2016-01-01) -
A dual hoist robot crane for large area sensing
by: Harber, John A.
Published: (2016) -
A unified mathematical model of functional efficiency of a hoisting crane
by: Goncharov K.A., et al.
Published: (2017-12-01) -
CHANGES JUSTIFICATION IN A CALCULATING METHOD OF LOAD STABILITY OF AUTOMOTIVE HOISTING CRANES AND AUTOMOTIVE MANIPULATOR CRANES BASED ON THE NORMATIVE DOCUMENTS ANALYSIS
by: K. G. Pugin
Published: (2020-07-01) -
Calculation methods' comparative analysis of monorail hoist crane local bending effects
by: Cvijović Goran M., et al.
Published: (2016-01-01)