A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process

Separated decision-making for maintenance and spare ordering is unrealistic in the industry, so this paper aims to optimize them together. A joint policy of inspection-based preventive maintenance (PM) and spare ordering considering two modes of spare ordering, namely, a regular order and an emergen...

Full description

Bibliographic Details
Main Authors: Fei Zhao, Fengfeng Xie, Chenghua Shi, Jianshe Kang
Format: Article
Language:English
Published: Hindawi-Wiley 2017-01-01
Series:Complexity
Online Access:http://dx.doi.org/10.1155/2017/8319485
id doaj-c76123d764d244129a8198cd46f6c800
record_format Article
spelling doaj-c76123d764d244129a8198cd46f6c8002020-11-25T02:37:33ZengHindawi-WileyComplexity1076-27871099-05262017-01-01201710.1155/2017/83194858319485A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure ProcessFei Zhao0Fengfeng Xie1Chenghua Shi2Jianshe Kang3School of Business Administration, Northeastern University, Shenyang 110819, ChinaNortheastern University at Qinhuangdao, Qinhuangdao 066004, ChinaSchool of Economics and Management, Hebei University of Engineering, Handan 056038, ChinaMechanical Engineering College, Shijiazhuang 050003, ChinaSeparated decision-making for maintenance and spare ordering is unrealistic in the industry, so this paper aims to optimize them together. A joint policy of inspection-based preventive maintenance (PM) and spare ordering considering two modes of spare ordering, namely, a regular order and an emergency order, is proposed for single-unit systems using a three-stage failure process. If the system is recognized to be in the minor defective stage, the original inspection interval is shortened and a regular order is placed. However, replacement is undertaken preventively or correctively if the severe defective stage is identified or a failure occurs. Depending on the system state and the state of the regular ordered spare when replacement is needed, all possible scenarios are considered to construct optimization model I. The decision variables are the optimal inspection interval and the times of shortening the original inspection interval. Additionally, model II on the basis of an assumption that the spare is always ordered at time 0 is also developed. The results from a numerical example illustrated the applicability and the effectiveness of model I compared to model II, and the irregular inspection policy is validated to be cost-saving compared to the regular inspection policy.http://dx.doi.org/10.1155/2017/8319485
collection DOAJ
language English
format Article
sources DOAJ
author Fei Zhao
Fengfeng Xie
Chenghua Shi
Jianshe Kang
spellingShingle Fei Zhao
Fengfeng Xie
Chenghua Shi
Jianshe Kang
A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
Complexity
author_facet Fei Zhao
Fengfeng Xie
Chenghua Shi
Jianshe Kang
author_sort Fei Zhao
title A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
title_short A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
title_full A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
title_fullStr A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
title_full_unstemmed A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
title_sort joint inspection-based preventive maintenance and spare ordering optimization policy using a three-stage failure process
publisher Hindawi-Wiley
series Complexity
issn 1076-2787
1099-0526
publishDate 2017-01-01
description Separated decision-making for maintenance and spare ordering is unrealistic in the industry, so this paper aims to optimize them together. A joint policy of inspection-based preventive maintenance (PM) and spare ordering considering two modes of spare ordering, namely, a regular order and an emergency order, is proposed for single-unit systems using a three-stage failure process. If the system is recognized to be in the minor defective stage, the original inspection interval is shortened and a regular order is placed. However, replacement is undertaken preventively or correctively if the severe defective stage is identified or a failure occurs. Depending on the system state and the state of the regular ordered spare when replacement is needed, all possible scenarios are considered to construct optimization model I. The decision variables are the optimal inspection interval and the times of shortening the original inspection interval. Additionally, model II on the basis of an assumption that the spare is always ordered at time 0 is also developed. The results from a numerical example illustrated the applicability and the effectiveness of model I compared to model II, and the irregular inspection policy is validated to be cost-saving compared to the regular inspection policy.
url http://dx.doi.org/10.1155/2017/8319485
work_keys_str_mv AT feizhao ajointinspectionbasedpreventivemaintenanceandspareorderingoptimizationpolicyusingathreestagefailureprocess
AT fengfengxie ajointinspectionbasedpreventivemaintenanceandspareorderingoptimizationpolicyusingathreestagefailureprocess
AT chenghuashi ajointinspectionbasedpreventivemaintenanceandspareorderingoptimizationpolicyusingathreestagefailureprocess
AT jianshekang ajointinspectionbasedpreventivemaintenanceandspareorderingoptimizationpolicyusingathreestagefailureprocess
AT feizhao jointinspectionbasedpreventivemaintenanceandspareorderingoptimizationpolicyusingathreestagefailureprocess
AT fengfengxie jointinspectionbasedpreventivemaintenanceandspareorderingoptimizationpolicyusingathreestagefailureprocess
AT chenghuashi jointinspectionbasedpreventivemaintenanceandspareorderingoptimizationpolicyusingathreestagefailureprocess
AT jianshekang jointinspectionbasedpreventivemaintenanceandspareorderingoptimizationpolicyusingathreestagefailureprocess
_version_ 1724794914331426816