Causes of delays in construction projects in Turkey

In both developing and industrialized countries, deviation from a planned time schedule is one of the most frequently encountered problems in construction investments. Various factors faced with during construction period prevent systematic flow of work, which causes time-based anomalies as a concl...

Full description

Bibliographic Details
Main Authors: Aynur Kazaz, Serdar Ulubeyli, Nihan Avcioglu Tuncbilekli
Format: Article
Language:English
Published: Vilnius Gediminas Technical University 2012-06-01
Series:Journal of Civil Engineering and Management
Subjects:
Online Access:http://journals.vgtu.lt/index.php/JCEM/article/view/4467
id doaj-c875c56bbabe4f94b825e63d06177e93
record_format Article
spelling doaj-c875c56bbabe4f94b825e63d06177e932021-07-02T04:18:09ZengVilnius Gediminas Technical UniversityJournal of Civil Engineering and Management1392-37301822-36052012-06-0118310.3846/13923730.2012.698913Causes of delays in construction projects in TurkeyAynur Kazaz0Serdar Ulubeyli1Nihan Avcioglu Tuncbilekli2Civil Engineering Department, Engineering Faculty, Akdeniz University, 07058 Antalya, TurkeyCivil Engineering Department, Engineering Faculty, Bulent Ecevit University, 67100 Zonguldak, TurkeyCivil Engineering Department, Engineering Faculty, Akdeniz University, 07058 Antalya, Turkey In both developing and industrialized countries, deviation from a planned time schedule is one of the most frequently encountered problems in construction investments. Various factors faced with during construction period prevent systematic flow of work, which causes time-based anomalies as a conclusion. Considering the vital importance of the construction industry on the macro-economic structure of a country, it is inevitable to be aware of considerable effect of the timely completion on the allocated project budget. In this study, causes of time extensions in the Turkish construction industry and levels of their importance were examined together. In total, 34 factors affecting project duration were taken into account. A questionnaire survey, including these factors, was then applied to 71 construction companies in Turkey, and the outcomes were evaluated by means of statistical analyses. According to the results, “design and material changes” was found to be the most predominant factor, followed by “delay of payments” and “cash flow problems”. In terms of importance levels of factor groups, financial factors were found to be the first group, while environmental factors were the least effective group. It should be also noted that managerial causes of time extensions are encountered in developed and developing countries, whereas financial causes are experienced in developing countries only. http://journals.vgtu.lt/index.php/JCEM/article/view/4467delaytime extensionconstruction projectsTurkey
collection DOAJ
language English
format Article
sources DOAJ
author Aynur Kazaz
Serdar Ulubeyli
Nihan Avcioglu Tuncbilekli
spellingShingle Aynur Kazaz
Serdar Ulubeyli
Nihan Avcioglu Tuncbilekli
Causes of delays in construction projects in Turkey
Journal of Civil Engineering and Management
delay
time extension
construction projects
Turkey
author_facet Aynur Kazaz
Serdar Ulubeyli
Nihan Avcioglu Tuncbilekli
author_sort Aynur Kazaz
title Causes of delays in construction projects in Turkey
title_short Causes of delays in construction projects in Turkey
title_full Causes of delays in construction projects in Turkey
title_fullStr Causes of delays in construction projects in Turkey
title_full_unstemmed Causes of delays in construction projects in Turkey
title_sort causes of delays in construction projects in turkey
publisher Vilnius Gediminas Technical University
series Journal of Civil Engineering and Management
issn 1392-3730
1822-3605
publishDate 2012-06-01
description In both developing and industrialized countries, deviation from a planned time schedule is one of the most frequently encountered problems in construction investments. Various factors faced with during construction period prevent systematic flow of work, which causes time-based anomalies as a conclusion. Considering the vital importance of the construction industry on the macro-economic structure of a country, it is inevitable to be aware of considerable effect of the timely completion on the allocated project budget. In this study, causes of time extensions in the Turkish construction industry and levels of their importance were examined together. In total, 34 factors affecting project duration were taken into account. A questionnaire survey, including these factors, was then applied to 71 construction companies in Turkey, and the outcomes were evaluated by means of statistical analyses. According to the results, “design and material changes” was found to be the most predominant factor, followed by “delay of payments” and “cash flow problems”. In terms of importance levels of factor groups, financial factors were found to be the first group, while environmental factors were the least effective group. It should be also noted that managerial causes of time extensions are encountered in developed and developing countries, whereas financial causes are experienced in developing countries only.
topic delay
time extension
construction projects
Turkey
url http://journals.vgtu.lt/index.php/JCEM/article/view/4467
work_keys_str_mv AT aynurkazaz causesofdelaysinconstructionprojectsinturkey
AT serdarulubeyli causesofdelaysinconstructionprojectsinturkey
AT nihanavcioglutuncbilekli causesofdelaysinconstructionprojectsinturkey
_version_ 1721340394112811008