Hoist scheduling for an anodizing plant at an extrusion company
The field of scheduling metal surface treatment plants is extensively studied in the literature and it is referred to by the name of Hoist Scheduling Problem (HSP). HSP is classified as a flow-shop scheduling problem, but differs because of the transportation constraints and the no-wait restriction....
Main Authors: | Alaa Jameel Alsaffar, Saad M. A. Suliman |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2020-01-01
|
Series: | Arab Journal of Basic and Applied Sciences |
Subjects: | |
Online Access: | http://dx.doi.org/10.1080/25765299.2020.1729931 |
Similar Items
-
Modélisation et optimisation des Hoist Scheduling Problems
by: Feng, Jianguang
Published: (2017) -
Scheduling of Anaesthesia Operations in Operating Rooms
by: Pi-Yu Hsu, et al.
Published: (2021-05-01) -
A heuristic algorithm for scheduling in a flow shop environment to minimize makespan
by: Arun Gupta, et al.
Published: (2015-04-01) -
A discrete Jaya algorithm for permutation flow-shop scheduling problem
by: Aseem K. Mishra, et al.
Published: (2020-03-01) -
Job shop scheduling with makespan objective: A heuristic approach
by: Mohsen Ziaee
Published: (2014-04-01)