Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online results

The beam dump facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for light dark matter and hidden sector models with the Search for Hidden Particles (SHiP...

Full description

Bibliographic Details
Main Authors: E. Lopez Sola, M. Calviani, O. Aberle, C. Ahdida, P. Avigni, M. Battistin, L. Bianchi, S. Burger, J. Busom Descarrega, J. Canhoto Espadanal, E. Cano-Pleite, M. Casolino, M. A. Fraser, S. Gilardoni, S. Girod, J-L. Grenard, D. Grenier, M. Guinchard, C. Hessler, R. Jacobsson, M. Lamont, A. Ortega Rolo, M. Pandey, A. Perillo-Marcone, B. Riffaud, V. Vlachoudis, L. Zuccalli
Format: Article
Language:English
Published: American Physical Society 2019-12-01
Series:Physical Review Accelerators and Beams
Online Access:http://doi.org/10.1103/PhysRevAccelBeams.22.123001
id doaj-cf300f0da9284369a110e58c7752301a
record_format Article
spelling doaj-cf300f0da9284369a110e58c7752301a2020-11-25T02:12:56ZengAmerican Physical SocietyPhysical Review Accelerators and Beams2469-98882019-12-01221212300110.1103/PhysRevAccelBeams.22.123001Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online resultsE. Lopez SolaM. CalvianiO. AberleC. AhdidaP. AvigniM. BattistinL. BianchiS. BurgerJ. Busom DescarregaJ. Canhoto EspadanalE. Cano-PleiteM. CasolinoM. A. FraserS. GilardoniS. GirodJ-L. GrenardD. GrenierM. GuinchardC. HesslerR. JacobssonM. LamontA. Ortega RoloM. PandeyA. Perillo-MarconeB. RiffaudV. VlachoudisL. ZuccalliThe beam dump facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for light dark matter and hidden sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safely the 400  GeV/c Super Proton Synchrotron (SPS) beam and to maximize the production of charm and beauty mesons. An average power of 300 kW will be deposited on the target, which will be subjected to unprecedented conditions in terms of temperature, structural loads and irradiation. In order to provide a representative validation of the target design, a prototype target has been designed, manufactured, and tested under the SPS fixed-target proton beam during 2018, up to an average beam power of 50 kW, corresponding to 350 kJ per pulse. The present contribution details the target prototype design and experimental setup, as well as a first evaluation of the measurements performed during beam irradiation. The analysis of the collected data suggests that a representative reproduction of the operational conditions of the beam dump facility target was achieved during the prototype tests, which will be complemented by a postirradiation examination campaign during 2020.http://doi.org/10.1103/PhysRevAccelBeams.22.123001
collection DOAJ
language English
format Article
sources DOAJ
author E. Lopez Sola
M. Calviani
O. Aberle
C. Ahdida
P. Avigni
M. Battistin
L. Bianchi
S. Burger
J. Busom Descarrega
J. Canhoto Espadanal
E. Cano-Pleite
M. Casolino
M. A. Fraser
S. Gilardoni
S. Girod
J-L. Grenard
D. Grenier
M. Guinchard
C. Hessler
R. Jacobsson
M. Lamont
A. Ortega Rolo
M. Pandey
A. Perillo-Marcone
B. Riffaud
V. Vlachoudis
L. Zuccalli
spellingShingle E. Lopez Sola
M. Calviani
O. Aberle
C. Ahdida
P. Avigni
M. Battistin
L. Bianchi
S. Burger
J. Busom Descarrega
J. Canhoto Espadanal
E. Cano-Pleite
M. Casolino
M. A. Fraser
S. Gilardoni
S. Girod
J-L. Grenard
D. Grenier
M. Guinchard
C. Hessler
R. Jacobsson
M. Lamont
A. Ortega Rolo
M. Pandey
A. Perillo-Marcone
B. Riffaud
V. Vlachoudis
L. Zuccalli
Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online results
Physical Review Accelerators and Beams
author_facet E. Lopez Sola
M. Calviani
O. Aberle
C. Ahdida
P. Avigni
M. Battistin
L. Bianchi
S. Burger
J. Busom Descarrega
J. Canhoto Espadanal
E. Cano-Pleite
M. Casolino
M. A. Fraser
S. Gilardoni
S. Girod
J-L. Grenard
D. Grenier
M. Guinchard
C. Hessler
R. Jacobsson
M. Lamont
A. Ortega Rolo
M. Pandey
A. Perillo-Marcone
B. Riffaud
V. Vlachoudis
L. Zuccalli
author_sort E. Lopez Sola
title Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online results
title_short Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online results
title_full Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online results
title_fullStr Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online results
title_full_unstemmed Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online results
title_sort beam impact tests of a prototype target for the beam dump facility at cern: experimental setup and preliminary analysis of the online results
publisher American Physical Society
series Physical Review Accelerators and Beams
issn 2469-9888
publishDate 2019-12-01
description The beam dump facility (BDF) is a project for a new facility at CERN dedicated to high intensity beam dump and fixed target experiments. Currently in its design phase, the first aim of the facility is to search for light dark matter and hidden sector models with the Search for Hidden Particles (SHiP) experiment. At the core of the facility sits a dense target/dump, whose function is to absorb safely the 400  GeV/c Super Proton Synchrotron (SPS) beam and to maximize the production of charm and beauty mesons. An average power of 300 kW will be deposited on the target, which will be subjected to unprecedented conditions in terms of temperature, structural loads and irradiation. In order to provide a representative validation of the target design, a prototype target has been designed, manufactured, and tested under the SPS fixed-target proton beam during 2018, up to an average beam power of 50 kW, corresponding to 350 kJ per pulse. The present contribution details the target prototype design and experimental setup, as well as a first evaluation of the measurements performed during beam irradiation. The analysis of the collected data suggests that a representative reproduction of the operational conditions of the beam dump facility target was achieved during the prototype tests, which will be complemented by a postirradiation examination campaign during 2020.
url http://doi.org/10.1103/PhysRevAccelBeams.22.123001
work_keys_str_mv AT elopezsola beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT mcalviani beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT oaberle beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT cahdida beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT pavigni beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT mbattistin beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT lbianchi beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT sburger beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT jbusomdescarrega beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT jcanhotoespadanal beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT ecanopleite beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT mcasolino beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT mafraser beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT sgilardoni beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT sgirod beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT jlgrenard beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT dgrenier beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT mguinchard beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT chessler beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT rjacobsson beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT mlamont beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT aortegarolo beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT mpandey beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT aperillomarcone beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT briffaud beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT vvlachoudis beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
AT lzuccalli beamimpacttestsofaprototypetargetforthebeamdumpfacilityatcernexperimentalsetupandpreliminaryanalysisoftheonlineresults
_version_ 1724907403785273344