Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case Study

The Architecture Engineering and Construction (AEC) sector has been working on an increasing number of mega projects having large scale investments worldwide. The majority of these mega projects are infrastructure projects that are comparatively more difficult to manage in terms of yielding an expec...

Full description

Bibliographic Details
Main Authors: Ozan Koseoglu, Basak Keskin, Beliz Ozorhon
Format: Article
Language:English
Published: MDPI AG 2019-05-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/9/5/115
id doaj-cf3e87c8732948fdac88376f20c7b5a6
record_format Article
spelling doaj-cf3e87c8732948fdac88376f20c7b5a62020-11-25T01:27:08ZengMDPI AGBuildings2075-53092019-05-019511510.3390/buildings9050115buildings9050115Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case StudyOzan Koseoglu0Basak Keskin1Beliz Ozorhon2Digital Living Services, Istanbul Park Bulvari, Royal Park Residence G8 Block, Istanbul 34956, TurkeyDepartment of Civil and Environmental Engineering, Syracuse University, Syracuse, NY 13244, USADepartment of Civil Engineering, Bogazici University, Istanbul 34342, TurkeyThe Architecture Engineering and Construction (AEC) sector has been working on an increasing number of mega projects having large scale investments worldwide. The majority of these mega projects are infrastructure projects that are comparatively more difficult to manage in terms of yielding an expected return of investments while increasing quality and productivity. Today’s construction technology landscape offers a wide variety of innovative digital solutions for optimizing the project constraints of scope, time, cost, quality, and resources. Despite being one of the least digitized sectors, the AEC sector is currently ripe for adopting innovative digital solutions. It is observed that Building Information Modeling (BIM) has been rapidly adopted to tackle the ever-evolving challenges of mega infrastructure projects. This study investigates the challenges and enablers of utilizing an end-to-end BIM strategy for digital transformation of mega project delivery processes through a mega airport project case study, in order to contribute a solid strategic understanding in BIM implementation for mega infrastructure projects. The case study is followed with two-phased semi-structured interviews. Based on the findings, major challenges are sustaining continuous monitoring and controlling in the project execution, engineering complexity and aligning stakeholders’ BIM learning curves whereas strategic control mechanisms, incentivizing the virtual collaborative environment, and continuous digital delivery are major enablers.https://www.mdpi.com/2075-5309/9/5/115building information modeling (BIM)digital transformationmega projectsconstruction innovationchallengesenablers
collection DOAJ
language English
format Article
sources DOAJ
author Ozan Koseoglu
Basak Keskin
Beliz Ozorhon
spellingShingle Ozan Koseoglu
Basak Keskin
Beliz Ozorhon
Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case Study
Buildings
building information modeling (BIM)
digital transformation
mega projects
construction innovation
challenges
enablers
author_facet Ozan Koseoglu
Basak Keskin
Beliz Ozorhon
author_sort Ozan Koseoglu
title Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case Study
title_short Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case Study
title_full Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case Study
title_fullStr Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case Study
title_full_unstemmed Challenges and Enablers in BIM-Enabled Digital Transformation in Mega Projects: The Istanbul New Airport Project Case Study
title_sort challenges and enablers in bim-enabled digital transformation in mega projects: the istanbul new airport project case study
publisher MDPI AG
series Buildings
issn 2075-5309
publishDate 2019-05-01
description The Architecture Engineering and Construction (AEC) sector has been working on an increasing number of mega projects having large scale investments worldwide. The majority of these mega projects are infrastructure projects that are comparatively more difficult to manage in terms of yielding an expected return of investments while increasing quality and productivity. Today’s construction technology landscape offers a wide variety of innovative digital solutions for optimizing the project constraints of scope, time, cost, quality, and resources. Despite being one of the least digitized sectors, the AEC sector is currently ripe for adopting innovative digital solutions. It is observed that Building Information Modeling (BIM) has been rapidly adopted to tackle the ever-evolving challenges of mega infrastructure projects. This study investigates the challenges and enablers of utilizing an end-to-end BIM strategy for digital transformation of mega project delivery processes through a mega airport project case study, in order to contribute a solid strategic understanding in BIM implementation for mega infrastructure projects. The case study is followed with two-phased semi-structured interviews. Based on the findings, major challenges are sustaining continuous monitoring and controlling in the project execution, engineering complexity and aligning stakeholders’ BIM learning curves whereas strategic control mechanisms, incentivizing the virtual collaborative environment, and continuous digital delivery are major enablers.
topic building information modeling (BIM)
digital transformation
mega projects
construction innovation
challenges
enablers
url https://www.mdpi.com/2075-5309/9/5/115
work_keys_str_mv AT ozankoseoglu challengesandenablersinbimenableddigitaltransformationinmegaprojectstheistanbulnewairportprojectcasestudy
AT basakkeskin challengesandenablersinbimenableddigitaltransformationinmegaprojectstheistanbulnewairportprojectcasestudy
AT belizozorhon challengesandenablersinbimenableddigitaltransformationinmegaprojectstheistanbulnewairportprojectcasestudy
_version_ 1725106666957963264