RC Arch Deck Development and Performance Evaluation for Enhanced Deck Width
Abstract Due to extreme business competitions in bridge construction industries, the cost reduction became the most important issue in winning a contract bidding. The largest bridge construction cost saving can be obtained by using precasted construction method and by reducing required number of gir...
Main Authors: | Dal-Hun Yang, Min-Jae Kwon, Gi-Ha Eom, Jang-Ho Jay Kim |
---|---|
Format: | Article |
Language: | English |
Published: |
SpringerOpen
2018-09-01
|
Series: | International Journal of Concrete Structures and Materials |
Subjects: | |
Online Access: | http://link.springer.com/article/10.1186/s40069-018-0295-y |
Similar Items
-
Design of the New Arch Bridge at Mioveni
by: Alexandru Dima, et al.
Published: (2014-07-01) -
Reducing top mat reinforcement in bridge decks
by: Foster, Stephen Wroe, 1986-
Published: (2010) -
Deep Deck and Cellular Deck Diaphragm Strength and Stiffness Evaluation
by: Bagwell, Jonathan
Published: (2014) -
Performance Criteria Recommendations for Mortars Used in Full-Depth Precast Concrete Bridge Deck Panel Systems
by: Scholz, Donald P.
Published: (2014) -
Fatigue Evaluation of Rib-to-Deck Joint in Orthotropic Steel Bridge Decks
by: Li, Ming
Published: (2015)