Moving to higher directional scheduling schemes
A general overview of the scheduling’s literature of some researches shows that among various factors, the priority rules and also the structure of projects are two main factors that can be affected on the performance of multidirectional scheduling schemes. In addition, a variation on the number of...
Main Authors: | Hamid Reza Yousefzade, Maryam Nasehi |
---|---|
Format: | Article |
Language: | English |
Published: |
Ferdowsi University of Mashhad
2020-04-01
|
Series: | Iranian Journal of Numerical Analysis and Optimization |
Subjects: | |
Online Access: | https://ijnao.um.ac.ir/article_25223_35835b94afdb9747e106d3ea34b969af.pdf |
Similar Items
-
Comparison of Heuristic Priority Rules in the Solution of the Resource-Constrained Project Scheduling Problem
by: Osman Hürol Türkakın, et al.
Published: (2021-09-01) -
A Multi-PR Heuristic for Distributed Multi-Project Scheduling With Uncertain Duration
by: Dongning Liu, et al.
Published: (2020-01-01) -
Investigating a claim about resource complexity measure
by: H.R. Yousefzadeh
Published: (2021-09-01) -
A NEW APPROACH TO JOB SHOP-SCHEDULING PROBLEM
by: Ramezanali Mahdavinejad
Published: (2007-03-01) -
A priority-based heuristic algorithm (PBHA) for optimizing integrated process planning and scheduling problem
by: Muhammad Farhan Ausaf, et al.
Published: (2015-12-01)