Multiple-criteria decision analysis of the transformable low-rise building technological construction process

One of the promising areas of improving the constructive and technological solutions of low-rise buildings is the fast-erecting systems. Increase of efficiency of the erection process of these systems can be implemented on the basis of the results of a multiple-criteria analysis of the organizationa...

Full description

Bibliographic Details
Main Authors: Korol Elena, Pleshivcev Alexander
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201819303042
id doaj-d6a8144f214548e99b4060aafccfe2af
record_format Article
spelling doaj-d6a8144f214548e99b4060aafccfe2af2021-02-02T05:29:54ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011930304210.1051/matecconf/201819303042matecconf_esci2018_03042Multiple-criteria decision analysis of the transformable low-rise building technological construction processKorol ElenaPleshivcev AlexanderOne of the promising areas of improving the constructive and technological solutions of low-rise buildings is the fast-erecting systems. Increase of efficiency of the erection process of these systems can be implemented on the basis of the results of a multiple-criteria analysis of the organizational and technological processes by decomposing it into separate technological processes and operations and assessing their impact on the overall building erection process. The structure of a multiple-criteria model includes such indexes as the duration of separate technological processes and the operation of the overground part in the building erection. The subject of the study – technological operation parameters during the installation process of the transformable low-rise buildings with sandwich panel walls. Based on selection, classification, and systematization of the factors determining the resultant indicators, the relationship between the effective indicator (function) and the factors (arguments) was studied and their forms of dependence were determined based on the linkage modeling. The calculation of the influence of various factors and their assessment on the change in value of the effective indicator was performed. The selected factors include several parameters in the form of technological operations, which are expressed in hours. The simulation of technological process using a multiple-criteria model allows determining the efficiency reserves of the developed technology. Its application in installation control processes could help the construction industry with transformable low-rise building erection.https://doi.org/10.1051/matecconf/201819303042
collection DOAJ
language English
format Article
sources DOAJ
author Korol Elena
Pleshivcev Alexander
spellingShingle Korol Elena
Pleshivcev Alexander
Multiple-criteria decision analysis of the transformable low-rise building technological construction process
MATEC Web of Conferences
author_facet Korol Elena
Pleshivcev Alexander
author_sort Korol Elena
title Multiple-criteria decision analysis of the transformable low-rise building technological construction process
title_short Multiple-criteria decision analysis of the transformable low-rise building technological construction process
title_full Multiple-criteria decision analysis of the transformable low-rise building technological construction process
title_fullStr Multiple-criteria decision analysis of the transformable low-rise building technological construction process
title_full_unstemmed Multiple-criteria decision analysis of the transformable low-rise building technological construction process
title_sort multiple-criteria decision analysis of the transformable low-rise building technological construction process
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description One of the promising areas of improving the constructive and technological solutions of low-rise buildings is the fast-erecting systems. Increase of efficiency of the erection process of these systems can be implemented on the basis of the results of a multiple-criteria analysis of the organizational and technological processes by decomposing it into separate technological processes and operations and assessing their impact on the overall building erection process. The structure of a multiple-criteria model includes such indexes as the duration of separate technological processes and the operation of the overground part in the building erection. The subject of the study – technological operation parameters during the installation process of the transformable low-rise buildings with sandwich panel walls. Based on selection, classification, and systematization of the factors determining the resultant indicators, the relationship between the effective indicator (function) and the factors (arguments) was studied and their forms of dependence were determined based on the linkage modeling. The calculation of the influence of various factors and their assessment on the change in value of the effective indicator was performed. The selected factors include several parameters in the form of technological operations, which are expressed in hours. The simulation of technological process using a multiple-criteria model allows determining the efficiency reserves of the developed technology. Its application in installation control processes could help the construction industry with transformable low-rise building erection.
url https://doi.org/10.1051/matecconf/201819303042
work_keys_str_mv AT korolelena multiplecriteriadecisionanalysisofthetransformablelowrisebuildingtechnologicalconstructionprocess
AT pleshivcevalexander multiplecriteriadecisionanalysisofthetransformablelowrisebuildingtechnologicalconstructionprocess
_version_ 1724303658345037824