Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage Plates

Due to a lack of engineering experience, research on ground deformation during shield machine tunneling in sludge layers is limited, especially in areas with plastic drainage plates installed for ground stabilization. When the shield passes through this area, the shield cutterhead may be jammed by t...

Full description

Bibliographic Details
Main Authors: Fan Zhang, Linchong Huang, Yu Liang
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2020/6625132
id doaj-d82d82fcccbb4b079512ba6c55a2388c
record_format Article
spelling doaj-d82d82fcccbb4b079512ba6c55a2388c2020-12-14T09:46:35ZengHindawi LimitedAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/66251326625132Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage PlatesFan Zhang0Linchong Huang1Yu Liang2School of Intelligent Systems Engineering, Sun Yat-Sen University, Shenzhen 518000, ChinaSchool of Aeronautics and Astronautics, Sun Yat-Sen University, Shenzhen 518000, ChinaSchool of Aeronautics and Astronautics, Sun Yat-Sen University, Shenzhen 518000, ChinaDue to a lack of engineering experience, research on ground deformation during shield machine tunneling in sludge layers is limited, especially in areas with plastic drainage plates installed for ground stabilization. When the shield passes through this area, the shield cutterhead may be jammed by the drainage plates, resulting in excavation surface instability, excess ground deformation, and schedule delay. In this work, a Mindlin solution for ground deformation in such a layer is obtained, considering four factors: the frontal additional pressure generated by the shield cutterhead due to the soil squeezing effect, the uneven lateral friction between the shield shell and the soil, the frontal friction generated by the shield cutterhead when cutting through the drainage plate, and the shield machine restart after shutdown. The results show that the theoretical curve is in good agreement with the measured values. The maximum settlement was approximately 10 m behind the excavation surface, and the maximum uplift was approximately 5 m in front of the excavation surface. The most influential factor among all the studied factors was the additional pressure on the shield cutter, which accounted for approximately 56% of the maximum settlement and 60% of the maximum uplift. The soil settlement mainly occurred within 12 m on both sides of the tunnel axis. The maximum settlements at the different soil depths tested were all directly below the tunnel axis.http://dx.doi.org/10.1155/2020/6625132
collection DOAJ
language English
format Article
sources DOAJ
author Fan Zhang
Linchong Huang
Yu Liang
spellingShingle Fan Zhang
Linchong Huang
Yu Liang
Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage Plates
Advances in Civil Engineering
author_facet Fan Zhang
Linchong Huang
Yu Liang
author_sort Fan Zhang
title Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage Plates
title_short Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage Plates
title_full Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage Plates
title_fullStr Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage Plates
title_full_unstemmed Calculation of Soil Deformation Caused by Shield Tunneling through the Sludge Layer with Plastic Drainage Plates
title_sort calculation of soil deformation caused by shield tunneling through the sludge layer with plastic drainage plates
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8086
1687-8094
publishDate 2020-01-01
description Due to a lack of engineering experience, research on ground deformation during shield machine tunneling in sludge layers is limited, especially in areas with plastic drainage plates installed for ground stabilization. When the shield passes through this area, the shield cutterhead may be jammed by the drainage plates, resulting in excavation surface instability, excess ground deformation, and schedule delay. In this work, a Mindlin solution for ground deformation in such a layer is obtained, considering four factors: the frontal additional pressure generated by the shield cutterhead due to the soil squeezing effect, the uneven lateral friction between the shield shell and the soil, the frontal friction generated by the shield cutterhead when cutting through the drainage plate, and the shield machine restart after shutdown. The results show that the theoretical curve is in good agreement with the measured values. The maximum settlement was approximately 10 m behind the excavation surface, and the maximum uplift was approximately 5 m in front of the excavation surface. The most influential factor among all the studied factors was the additional pressure on the shield cutter, which accounted for approximately 56% of the maximum settlement and 60% of the maximum uplift. The soil settlement mainly occurred within 12 m on both sides of the tunnel axis. The maximum settlements at the different soil depths tested were all directly below the tunnel axis.
url http://dx.doi.org/10.1155/2020/6625132
work_keys_str_mv AT fanzhang calculationofsoildeformationcausedbyshieldtunnelingthroughthesludgelayerwithplasticdrainageplates
AT linchonghuang calculationofsoildeformationcausedbyshieldtunnelingthroughthesludgelayerwithplasticdrainageplates
AT yuliang calculationofsoildeformationcausedbyshieldtunnelingthroughthesludgelayerwithplasticdrainageplates
_version_ 1714998472081408000