The cost of implementing OHSMS regulation on high-rise building projects
In 2014, the Ministry of Public Works and Housing have published regulation that require the full implementation of Occupational Safety and Health Management System or short as OHSMS (known as SMK3 in Indonesia) in all phases of construction projects. The so called PerMenPUPR 5/2014 imposed an alloc...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_05007.pdf |
id |
doaj-d834749fa62a499287db201c30c2ea9d |
---|---|
record_format |
Article |
spelling |
doaj-d834749fa62a499287db201c30c2ea9d2021-04-02T13:52:12ZengEDP SciencesMATEC Web of Conferences2261-236X2019-01-012700500710.1051/matecconf/201927005007matecconf_concern2018_05007The cost of implementing OHSMS regulation on high-rise building projectsWirahadikusumah Reini D.Adhiwira FelixIn 2014, the Ministry of Public Works and Housing have published regulation that require the full implementation of Occupational Safety and Health Management System or short as OHSMS (known as SMK3 in Indonesia) in all phases of construction projects. The so called PerMenPUPR 5/2014 imposed an allocation of cost specific for OHSMS in the owner’s estimate, which was later updated as PerMenPUPR 2/2018 for minor adjustments in the regulation. This regulation was supported with guidelines for project managers on estimating the cost allocation for OHSMS. However, the initiative to address safety issues more comprehensively has been ineffective. The directive has not been seriously implemented by stakeholders on public projects. Thus, to help convince all stakeholders, more quantitative evidence on the costs for implementing OHSMS is pursued. This study is to determine the percentage of costs allocated by contractors for the procurement of OHSMS components. Data were collected from surveys to eight construction sites of high-rise building projects in Jakarta and Bandung. Based on interviews, questionnaires, and supporting documents from each case study, the cost of implementing the regulation was simulated and estimated. The cost allocation ranges from 2.01% to 3.70% of the contract value. The most significant components of the costs were related to OSH personnel (44.10%), insurance and licensing (35.2%), and OSH induction and promotion (5.82%).https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_05007.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Wirahadikusumah Reini D. Adhiwira Felix |
spellingShingle |
Wirahadikusumah Reini D. Adhiwira Felix The cost of implementing OHSMS regulation on high-rise building projects MATEC Web of Conferences |
author_facet |
Wirahadikusumah Reini D. Adhiwira Felix |
author_sort |
Wirahadikusumah Reini D. |
title |
The cost of implementing OHSMS regulation on high-rise building projects |
title_short |
The cost of implementing OHSMS regulation on high-rise building projects |
title_full |
The cost of implementing OHSMS regulation on high-rise building projects |
title_fullStr |
The cost of implementing OHSMS regulation on high-rise building projects |
title_full_unstemmed |
The cost of implementing OHSMS regulation on high-rise building projects |
title_sort |
cost of implementing ohsms regulation on high-rise building projects |
publisher |
EDP Sciences |
series |
MATEC Web of Conferences |
issn |
2261-236X |
publishDate |
2019-01-01 |
description |
In 2014, the Ministry of Public Works and Housing have published regulation that require the full implementation of Occupational Safety and Health Management System or short as OHSMS (known as SMK3 in Indonesia) in all phases of construction projects. The so called PerMenPUPR 5/2014 imposed an allocation of cost specific for OHSMS in the owner’s estimate, which was later updated as PerMenPUPR 2/2018 for minor adjustments in the regulation. This regulation was supported with guidelines for project managers on estimating the cost allocation for OHSMS. However, the initiative to address safety issues more comprehensively has been ineffective. The directive has not been seriously implemented by stakeholders on public projects. Thus, to help convince all stakeholders, more quantitative evidence on the costs for implementing OHSMS is pursued. This study is to determine the percentage of costs allocated by contractors for the procurement of OHSMS components. Data were collected from surveys to eight construction sites of high-rise building projects in Jakarta and Bandung. Based on interviews, questionnaires, and supporting documents from each case study, the cost of implementing the regulation was simulated and estimated. The cost allocation ranges from 2.01% to 3.70% of the contract value. The most significant components of the costs were related to OSH personnel (44.10%), insurance and licensing (35.2%), and OSH induction and promotion (5.82%). |
url |
https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_05007.pdf |
work_keys_str_mv |
AT wirahadikusumahreinid thecostofimplementingohsmsregulationonhighrisebuildingprojects AT adhiwirafelix thecostofimplementingohsmsregulationonhighrisebuildingprojects AT wirahadikusumahreinid costofimplementingohsmsregulationonhighrisebuildingprojects AT adhiwirafelix costofimplementingohsmsregulationonhighrisebuildingprojects |
_version_ |
1721563766022209536 |