The cost of implementing OHSMS regulation on high-rise building projects

In 2014, the Ministry of Public Works and Housing have published regulation that require the full implementation of Occupational Safety and Health Management System or short as OHSMS (known as SMK3 in Indonesia) in all phases of construction projects. The so called PerMenPUPR 5/2014 imposed an alloc...

Full description

Bibliographic Details
Main Authors: Wirahadikusumah Reini D., Adhiwira Felix
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_05007.pdf
id doaj-d834749fa62a499287db201c30c2ea9d
record_format Article
spelling doaj-d834749fa62a499287db201c30c2ea9d2021-04-02T13:52:12ZengEDP SciencesMATEC Web of Conferences2261-236X2019-01-012700500710.1051/matecconf/201927005007matecconf_concern2018_05007The cost of implementing OHSMS regulation on high-rise building projectsWirahadikusumah Reini D.Adhiwira FelixIn 2014, the Ministry of Public Works and Housing have published regulation that require the full implementation of Occupational Safety and Health Management System or short as OHSMS (known as SMK3 in Indonesia) in all phases of construction projects. The so called PerMenPUPR 5/2014 imposed an allocation of cost specific for OHSMS in the owner’s estimate, which was later updated as PerMenPUPR 2/2018 for minor adjustments in the regulation. This regulation was supported with guidelines for project managers on estimating the cost allocation for OHSMS. However, the initiative to address safety issues more comprehensively has been ineffective. The directive has not been seriously implemented by stakeholders on public projects. Thus, to help convince all stakeholders, more quantitative evidence on the costs for implementing OHSMS is pursued. This study is to determine the percentage of costs allocated by contractors for the procurement of OHSMS components. Data were collected from surveys to eight construction sites of high-rise building projects in Jakarta and Bandung. Based on interviews, questionnaires, and supporting documents from each case study, the cost of implementing the regulation was simulated and estimated. The cost allocation ranges from 2.01% to 3.70% of the contract value. The most significant components of the costs were related to OSH personnel (44.10%), insurance and licensing (35.2%), and OSH induction and promotion (5.82%).https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_05007.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Wirahadikusumah Reini D.
Adhiwira Felix
spellingShingle Wirahadikusumah Reini D.
Adhiwira Felix
The cost of implementing OHSMS regulation on high-rise building projects
MATEC Web of Conferences
author_facet Wirahadikusumah Reini D.
Adhiwira Felix
author_sort Wirahadikusumah Reini D.
title The cost of implementing OHSMS regulation on high-rise building projects
title_short The cost of implementing OHSMS regulation on high-rise building projects
title_full The cost of implementing OHSMS regulation on high-rise building projects
title_fullStr The cost of implementing OHSMS regulation on high-rise building projects
title_full_unstemmed The cost of implementing OHSMS regulation on high-rise building projects
title_sort cost of implementing ohsms regulation on high-rise building projects
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2019-01-01
description In 2014, the Ministry of Public Works and Housing have published regulation that require the full implementation of Occupational Safety and Health Management System or short as OHSMS (known as SMK3 in Indonesia) in all phases of construction projects. The so called PerMenPUPR 5/2014 imposed an allocation of cost specific for OHSMS in the owner’s estimate, which was later updated as PerMenPUPR 2/2018 for minor adjustments in the regulation. This regulation was supported with guidelines for project managers on estimating the cost allocation for OHSMS. However, the initiative to address safety issues more comprehensively has been ineffective. The directive has not been seriously implemented by stakeholders on public projects. Thus, to help convince all stakeholders, more quantitative evidence on the costs for implementing OHSMS is pursued. This study is to determine the percentage of costs allocated by contractors for the procurement of OHSMS components. Data were collected from surveys to eight construction sites of high-rise building projects in Jakarta and Bandung. Based on interviews, questionnaires, and supporting documents from each case study, the cost of implementing the regulation was simulated and estimated. The cost allocation ranges from 2.01% to 3.70% of the contract value. The most significant components of the costs were related to OSH personnel (44.10%), insurance and licensing (35.2%), and OSH induction and promotion (5.82%).
url https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_05007.pdf
work_keys_str_mv AT wirahadikusumahreinid thecostofimplementingohsmsregulationonhighrisebuildingprojects
AT adhiwirafelix thecostofimplementingohsmsregulationonhighrisebuildingprojects
AT wirahadikusumahreinid costofimplementingohsmsregulationonhighrisebuildingprojects
AT adhiwirafelix costofimplementingohsmsregulationonhighrisebuildingprojects
_version_ 1721563766022209536