Evaluation of Activated Sludge with a Submerged Fixed Bed in the Removal of Phosphorus and Nitrogen Compounds from Hospital Wastewater

Aerobic treatment processes with fixed growths exhibit a high efficiency not only in the removal of organic materials and phosphorus but also in the nitrification process (conversion of ammonium to nitrate) in wastewater. The present study aims to evaluate the performance of activated sludge with a...

Full description

Bibliographic Details
Main Authors: meghdad pirsaheb, masoud moradi, Kiomars Sharafi
Format: Article
Language:English
Published: Water and Wastewater Consulting Engineers Research Development 2015-07-01
Series:آب و فاضلاب
Subjects:
Online Access:http://www.wwjournal.ir/article_7912_09248c5c7ca53bef39d388490a87b8d7.pdf
id doaj-dacf07e31fb24426998f2ff7e7f5c8ea
record_format Article
spelling doaj-dacf07e31fb24426998f2ff7e7f5c8ea2021-03-02T03:56:16ZengWater and Wastewater Consulting Engineers Research Developmentآب و فاضلاب1024-59362383-09052015-07-0126328367912Evaluation of Activated Sludge with a Submerged Fixed Bed in the Removal of Phosphorus and Nitrogen Compounds from Hospital Wastewatermeghdad pirsaheb0masoud moradi1Kiomars Sharafi2Assoc. Prof. of Environmental Health Eng., Kermanshah University of Medical Sciences, Kermanshah, IranPhD Student of Research Center for Environmental Determination of Health (RCEDH), Kermanshah University of Medical Sciences, Kermanshah, IranPhD Student of Environmental Health Eng., Kermanshah University of Medical Sciences, Kermanshah, IranAerobic treatment processes with fixed growths exhibit a high efficiency not only in the removal of organic materials and phosphorus but also in the nitrification process (conversion of ammonium to nitrate) in wastewater. The present study aims to evaluate the performance of activated sludge with a submerged fixed bed in the removal of phosphorus and nitrogen compounds from wastewater. For this purpose, a reactor was initially constructed and commissioned before the activated sludge with a submerged fixed bed was loaded. A total number of 225 samples were collected from the wastewater treatment plant at Farabi General Hospital in Kermanshah to evaluate the removal efficiency of ammonia nitrogen, total nitrogen, nitrite, nitrate, and phosphate over three different retention times (2.9 hours of aerobic and 1.1 hours of anaerobic operation; 3.6 hours ofaerobic and 1.4 hours of anaerobic operation; and 4 hours of aerobic and 1.5 hours of anaerobic operation). Phosphorus, ammonia nitrogen, nitrite, and nitrate measurements were performed according to the Standard methods 4500-P, 4500-NH3, 4500-NO2, and 4500-NO3, respectively. Results showed that the highest phosphorus removal (53%) was achieved with Phase III of the system (i.e., 4 hours of aerobic plus 1.5 hours of anaerobic operation) while the highest ammonia nitrogen removal (97%) and TKN (96%) were achieved in Phase II of the system (i.e., 3.6 hours of aerobic and 1.4 hours of anaerobic operation). Significant differences (Pvaluehttp://www.wwjournal.ir/article_7912_09248c5c7ca53bef39d388490a87b8d7.pdfhospital wastewaterBiofilmFixed Growth with The Submerged BedPhosphorusNitrogen Compounds
collection DOAJ
language English
format Article
sources DOAJ
author meghdad pirsaheb
masoud moradi
Kiomars Sharafi
spellingShingle meghdad pirsaheb
masoud moradi
Kiomars Sharafi
Evaluation of Activated Sludge with a Submerged Fixed Bed in the Removal of Phosphorus and Nitrogen Compounds from Hospital Wastewater
آب و فاضلاب
hospital wastewater
Biofilm
Fixed Growth with The Submerged Bed
Phosphorus
Nitrogen Compounds
author_facet meghdad pirsaheb
masoud moradi
Kiomars Sharafi
author_sort meghdad pirsaheb
title Evaluation of Activated Sludge with a Submerged Fixed Bed in the Removal of Phosphorus and Nitrogen Compounds from Hospital Wastewater
title_short Evaluation of Activated Sludge with a Submerged Fixed Bed in the Removal of Phosphorus and Nitrogen Compounds from Hospital Wastewater
title_full Evaluation of Activated Sludge with a Submerged Fixed Bed in the Removal of Phosphorus and Nitrogen Compounds from Hospital Wastewater
title_fullStr Evaluation of Activated Sludge with a Submerged Fixed Bed in the Removal of Phosphorus and Nitrogen Compounds from Hospital Wastewater
title_full_unstemmed Evaluation of Activated Sludge with a Submerged Fixed Bed in the Removal of Phosphorus and Nitrogen Compounds from Hospital Wastewater
title_sort evaluation of activated sludge with a submerged fixed bed in the removal of phosphorus and nitrogen compounds from hospital wastewater
publisher Water and Wastewater Consulting Engineers Research Development
series آب و فاضلاب
issn 1024-5936
2383-0905
publishDate 2015-07-01
description Aerobic treatment processes with fixed growths exhibit a high efficiency not only in the removal of organic materials and phosphorus but also in the nitrification process (conversion of ammonium to nitrate) in wastewater. The present study aims to evaluate the performance of activated sludge with a submerged fixed bed in the removal of phosphorus and nitrogen compounds from wastewater. For this purpose, a reactor was initially constructed and commissioned before the activated sludge with a submerged fixed bed was loaded. A total number of 225 samples were collected from the wastewater treatment plant at Farabi General Hospital in Kermanshah to evaluate the removal efficiency of ammonia nitrogen, total nitrogen, nitrite, nitrate, and phosphate over three different retention times (2.9 hours of aerobic and 1.1 hours of anaerobic operation; 3.6 hours ofaerobic and 1.4 hours of anaerobic operation; and 4 hours of aerobic and 1.5 hours of anaerobic operation). Phosphorus, ammonia nitrogen, nitrite, and nitrate measurements were performed according to the Standard methods 4500-P, 4500-NH3, 4500-NO2, and 4500-NO3, respectively. Results showed that the highest phosphorus removal (53%) was achieved with Phase III of the system (i.e., 4 hours of aerobic plus 1.5 hours of anaerobic operation) while the highest ammonia nitrogen removal (97%) and TKN (96%) were achieved in Phase II of the system (i.e., 3.6 hours of aerobic and 1.4 hours of anaerobic operation). Significant differences (Pvalue
topic hospital wastewater
Biofilm
Fixed Growth with The Submerged Bed
Phosphorus
Nitrogen Compounds
url http://www.wwjournal.ir/article_7912_09248c5c7ca53bef39d388490a87b8d7.pdf
work_keys_str_mv AT meghdadpirsaheb evaluationofactivatedsludgewithasubmergedfixedbedintheremovalofphosphorusandnitrogencompoundsfromhospitalwastewater
AT masoudmoradi evaluationofactivatedsludgewithasubmergedfixedbedintheremovalofphosphorusandnitrogencompoundsfromhospitalwastewater
AT kiomarssharafi evaluationofactivatedsludgewithasubmergedfixedbedintheremovalofphosphorusandnitrogencompoundsfromhospitalwastewater
_version_ 1724243445163229184