Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China

To determine the layout parameters of the gas drainage roadway (GDR) serving for the working face, an analytical calculation method of fracture zone and the modelling experiment were adopted, and the overburden fissure induced by mining and the height of fracture zone were analyzed. For the research...

Full description

Bibliographic Details
Main Authors: Zhiliu Wang, Bo Liu, Yanhui Han, Zhaoyang Li, Yingjie Cao, Fuzhou Qi
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/3007807
id doaj-db50772a599e4d2287d3cbd7705dfbe7
record_format Article
spelling doaj-db50772a599e4d2287d3cbd7705dfbe72021-06-21T02:25:11ZengHindawi LimitedAdvances in Civil Engineering1687-80942021-01-01202110.1155/2021/3007807Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine ChinaZhiliu Wang0Bo Liu1Yanhui Han2Zhaoyang Li3Yingjie Cao4Fuzhou Qi5School of Civil & Architecture EngineeringSchool of Mechanics & Civil EngineeringDepartment of Civil Environmental and Geo-EngineeringSchool of Mechanics & Civil EngineeringSchool of Mechanics & Civil EngineeringSchool of Civil & Architecture EngineeringTo determine the layout parameters of the gas drainage roadway (GDR) serving for the working face, an analytical calculation method of fracture zone and the modelling experiment were adopted, and the overburden fissure induced by mining and the height of fracture zone were analyzed. For the research on the distribution of fracture zone by analytical calculation method, the multiple factors influencing the failure mode of strata and the height of fracture zone were considered. The #1207 working face in Sima mine was taken as an engineering background, and the layout parameters of GDR were given by analyzing the height of fracture zone. Combining the results obtained by analytical calculation and scale modelling experiment, the suggested height of GDR was 10.7–32.8 m away from the coal seam roof, and the projection distance of GDR in the horizontal was within the range of 0–35 m from the airway. By monitoring the gas drainage effects in different heights away from coal seam roof in #1207 working face and in different horizontal distances away from the ventilation roadway in the #1211 working face, the results showed that the optimal height was 17.5–22 m away from coal roof, and the optimal horizontal distance was 17–21 m away from airway for GDR. The gas drainage effect of GDR indicated that the proposed parameters are scientific and reasonable.http://dx.doi.org/10.1155/2021/3007807
collection DOAJ
language English
format Article
sources DOAJ
author Zhiliu Wang
Bo Liu
Yanhui Han
Zhaoyang Li
Yingjie Cao
Fuzhou Qi
spellingShingle Zhiliu Wang
Bo Liu
Yanhui Han
Zhaoyang Li
Yingjie Cao
Fuzhou Qi
Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
Advances in Civil Engineering
author_facet Zhiliu Wang
Bo Liu
Yanhui Han
Zhaoyang Li
Yingjie Cao
Fuzhou Qi
author_sort Zhiliu Wang
title Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
title_short Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
title_full Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
title_fullStr Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
title_full_unstemmed Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China
title_sort determining the layout parameters of the gas drainage roadway: a study for sima coalmine china
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8094
publishDate 2021-01-01
description To determine the layout parameters of the gas drainage roadway (GDR) serving for the working face, an analytical calculation method of fracture zone and the modelling experiment were adopted, and the overburden fissure induced by mining and the height of fracture zone were analyzed. For the research on the distribution of fracture zone by analytical calculation method, the multiple factors influencing the failure mode of strata and the height of fracture zone were considered. The #1207 working face in Sima mine was taken as an engineering background, and the layout parameters of GDR were given by analyzing the height of fracture zone. Combining the results obtained by analytical calculation and scale modelling experiment, the suggested height of GDR was 10.7–32.8 m away from the coal seam roof, and the projection distance of GDR in the horizontal was within the range of 0–35 m from the airway. By monitoring the gas drainage effects in different heights away from coal seam roof in #1207 working face and in different horizontal distances away from the ventilation roadway in the #1211 working face, the results showed that the optimal height was 17.5–22 m away from coal roof, and the optimal horizontal distance was 17–21 m away from airway for GDR. The gas drainage effect of GDR indicated that the proposed parameters are scientific and reasonable.
url http://dx.doi.org/10.1155/2021/3007807
work_keys_str_mv AT zhiliuwang determiningthelayoutparametersofthegasdrainageroadwayastudyforsimacoalminechina
AT boliu determiningthelayoutparametersofthegasdrainageroadwayastudyforsimacoalminechina
AT yanhuihan determiningthelayoutparametersofthegasdrainageroadwayastudyforsimacoalminechina
AT zhaoyangli determiningthelayoutparametersofthegasdrainageroadwayastudyforsimacoalminechina
AT yingjiecao determiningthelayoutparametersofthegasdrainageroadwayastudyforsimacoalminechina
AT fuzhouqi determiningthelayoutparametersofthegasdrainageroadwayastudyforsimacoalminechina
_version_ 1721369291243126784