An Improved Ground Control Point Configuration for Digital Surface Model Construction in a Coal Waste Dump Using an Unmanned Aerial Vehicle System
Coal production in opencast mining generates substantial waste materials, which are typically delivered to an on-site waste dump. As a large artificial loose pile, such dumps have a special multi-berm structure accompanied by some security issues due to wind and water erosion. Highly accurate digita...
Main Authors: | He Ren, Yanling Zhao, Wu Xiao, Xin Wang, Tao Sui |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-05-01
|
Series: | Remote Sensing |
Subjects: | |
Online Access: | https://www.mdpi.com/2072-4292/12/10/1623 |
Similar Items
-
STRUCTURE OF THE POPULATION OF CARABIDS (COLEOPTERA, CARABIDAE) ON RECULTIVATED COAL MINE DUMPS
by: N. I. Eremeeva, et al.
Published: (2015-11-01) -
NEUTRALIZING OF WASTE PESTICIDES FROM DUMPING GROUNDS BY MEANS OF EXPLOSIVE BURNING
by: Jolanta Biegańska, et al.
Published: (2014-10-01) -
Aspects of slope stability in opencast coal mining
by: Ojo, O.
Published: (1987) -
Polish legal regulations considering recovery of secondary materials from coal mining dumping grounds
by: Gawor Łukasz
Published: (2014-12-01) -
Feasibility of In-Situ Aeration of Old Dumping Ground for Land Reclamation
by: Huan-Huan Tong, et al.
Published: (2013-12-01)