Earthquake emergency plan analysis; a case study of Bacău County in Romania
The work is structured as follows: First, it will briefly talk about an emergency plan’s function and structure. From this starting point the article will move on to the actual plan and highlight some of its major deficiencies. Special attention will be given to why having a model plan is a bad idea...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Bucharest
2017-04-01
|
Series: | GeoPatterns |
Subjects: | |
Online Access: | http://www.geodinamic.ro/assets/geo-patterns/volumes/v2.1_26-30.pdf |
id |
doaj-def5f068bccf4ca5bf458edfed59e87b |
---|---|
record_format |
Article |
spelling |
doaj-def5f068bccf4ca5bf458edfed59e87b2020-11-25T01:18:12ZengUniversity of BucharestGeoPatterns2501-78372501-78372017-04-01212630Earthquake emergency plan analysis; a case study of Bacău County in RomaniaRadu Ionescu 0University of BucharestThe work is structured as follows: First, it will briefly talk about an emergency plan’s function and structure. From this starting point the article will move on to the actual plan and highlight some of its major deficiencies. Special attention will be given to why having a model plan is a bad idea and to the link between emergency plans and policy/legislative context. In the end, a couple of the plan’s strong points will be discussed. The main point to be drawn from this plan’s analysis is that focusing on the policy and the deadlines it imposes without taking in to account local limitations leads to hastily, mass-produced plans, which are far removed from the recommended planning process.http://www.geodinamic.ro/assets/geo-patterns/volumes/v2.1_26-30.pdfIntegrated Emergency Managementemergency planningearthquake planninglandslide planningemergency plan analysis |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Radu Ionescu |
spellingShingle |
Radu Ionescu Earthquake emergency plan analysis; a case study of Bacău County in Romania GeoPatterns Integrated Emergency Management emergency planning earthquake planning landslide planning emergency plan analysis |
author_facet |
Radu Ionescu |
author_sort |
Radu Ionescu |
title |
Earthquake emergency plan analysis; a case study of Bacău County in Romania |
title_short |
Earthquake emergency plan analysis; a case study of Bacău County in Romania |
title_full |
Earthquake emergency plan analysis; a case study of Bacău County in Romania |
title_fullStr |
Earthquake emergency plan analysis; a case study of Bacău County in Romania |
title_full_unstemmed |
Earthquake emergency plan analysis; a case study of Bacău County in Romania |
title_sort |
earthquake emergency plan analysis; a case study of bacău county in romania |
publisher |
University of Bucharest |
series |
GeoPatterns |
issn |
2501-7837 2501-7837 |
publishDate |
2017-04-01 |
description |
The work is structured as follows: First, it will briefly talk about an emergency plan’s function and structure. From this starting point the article will move on to the actual plan and highlight some of its major deficiencies. Special attention will be given to why having a model plan is a bad idea and to the link between emergency plans and policy/legislative context. In the end, a couple of the plan’s strong points will be discussed. The main point to be drawn from this plan’s analysis is that focusing on the policy and the deadlines it imposes without taking in to account local limitations leads to hastily, mass-produced plans, which are far removed from the recommended planning process. |
topic |
Integrated Emergency Management emergency planning earthquake planning landslide planning emergency plan analysis |
url |
http://www.geodinamic.ro/assets/geo-patterns/volumes/v2.1_26-30.pdf |
work_keys_str_mv |
AT raduionescu earthquakeemergencyplananalysisacasestudyofbacaucountyinromania |
_version_ |
1725143164382085120 |