Analysis of the Barriers to the Implementation of Integrated Project Delivery (IPD): A Meta-Synthesis Approach
The right selection of implementation system for projects in the construction industry is critical to achieve success. Integrated Project Delivery (IPD), is a comprehensive implementation system which has in recent years been seen to play an effective role in projects improved efficiency. Implementi...
Main Authors: | Zahra Kahvandi, Ehsan Saghatforoush, Mohammad Mahoud, Christopher Preece |
---|---|
Format: | Article |
Language: | English |
Published: |
De Gruyter Poland
2019-01-01
|
Series: | Journal of Engineering, Project, and Production Management |
Subjects: | |
Online Access: | http://www.ppml.url.tw/EPPM_Journal/volumns/09_01_January_2019/ID_190_9_1_2_11.pdf |
Similar Items
-
Solutions to Overcome Barriers of Implementing Constructability, Operability, and Maintainability (COM) Concepts in Infrastructure Projects: A Meta-Synthesis Approach.
by: Arbabi, O., et al.
Published: (2017-07-01) -
Case-based Study and Analysis of Integrated Project Delivery (IPD) Approach and Trust-Building Attributes
by: Pishdad-Bozorgi, Pardis
Published: (2017) -
Integrated Project Delivery (IPD) Research Trends.
by: Kahvandi, Z., et al.
Published: (2017-07-01) -
Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study
by: Marina L. Viana, et al.
Published: (2020-05-01) -
Collaborative project delivery methods: a scoping review
by: Atle Engebø, et al.
Published: (2020-03-01)