Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods
Based on the perspective of cost risk management of the entire process of power grid construction project, the WBS-RBS risk identification method is applied. The risk factors of power grid engineering cost are comprehensively identified from the five major engineering cost formation stages: investme...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/6217872 |
id |
doaj-e15c5c817de0422c9b2f829a45019e9c |
---|---|
record_format |
Article |
spelling |
doaj-e15c5c817de0422c9b2f829a45019e9c2020-11-25T03:24:00ZengHindawi LimitedMathematical Problems in Engineering1024-123X1563-51472020-01-01202010.1155/2020/62178726217872Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree MethodsJiao Wang0School of Business Economic Management, North–East China Electric Power University, Jilin 132012, ChinaBased on the perspective of cost risk management of the entire process of power grid construction project, the WBS-RBS risk identification method is applied. The risk factors of power grid engineering cost are comprehensively identified from the five major engineering cost formation stages: investment decision estimate stage, design estimate stage, bidding price stage, construction budget stage, and final account stage. Combined with the basic data obtained from the questionnaire, the membership degree method is adopted to screen the key indicators of the preliminary factors of cost risk and then eliminate the redundant indicators. Furthermore, a set of simple and efficient risk evaluation index system for power grid engineering cost is constructed in order to improve the risk evaluation and management level of power grid construction project in China.http://dx.doi.org/10.1155/2020/6217872 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Jiao Wang |
spellingShingle |
Jiao Wang Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods Mathematical Problems in Engineering |
author_facet |
Jiao Wang |
author_sort |
Jiao Wang |
title |
Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods |
title_short |
Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods |
title_full |
Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods |
title_fullStr |
Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods |
title_full_unstemmed |
Construction of Risk Evaluation Index System for Power Grid Engineering Cost by Applying WBS-RBS and Membership Degree Methods |
title_sort |
construction of risk evaluation index system for power grid engineering cost by applying wbs-rbs and membership degree methods |
publisher |
Hindawi Limited |
series |
Mathematical Problems in Engineering |
issn |
1024-123X 1563-5147 |
publishDate |
2020-01-01 |
description |
Based on the perspective of cost risk management of the entire process of power grid construction project, the WBS-RBS risk identification method is applied. The risk factors of power grid engineering cost are comprehensively identified from the five major engineering cost formation stages: investment decision estimate stage, design estimate stage, bidding price stage, construction budget stage, and final account stage. Combined with the basic data obtained from the questionnaire, the membership degree method is adopted to screen the key indicators of the preliminary factors of cost risk and then eliminate the redundant indicators. Furthermore, a set of simple and efficient risk evaluation index system for power grid engineering cost is constructed in order to improve the risk evaluation and management level of power grid construction project in China. |
url |
http://dx.doi.org/10.1155/2020/6217872 |
work_keys_str_mv |
AT jiaowang constructionofriskevaluationindexsystemforpowergridengineeringcostbyapplyingwbsrbsandmembershipdegreemethods |
_version_ |
1715227527094468608 |