Stochastic Seasonal Planning in Multireservoir Hydroelectric Power Systems by Differential Dynamic Programming
A first-order differential dynamic programming (DDP) algorithm is used for computing optimal control for a five-reservoir system, where the stochastic inflow process has been approximated by a few discrete disturbance values in each time step. The method is found to be faster than linear programming...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Norwegian Society of Automatic Control
1982-07-01
|
Series: | Modeling, Identification and Control |
Subjects: | |
Online Access: | http://www.mic-journal.no/PDF/1982/MIC-1982-3-1.pdf |
id |
doaj-e23691f016204992a2ea8b7f7340e0d4 |
---|---|
record_format |
Article |
spelling |
doaj-e23691f016204992a2ea8b7f7340e0d42020-11-25T00:47:42ZengNorwegian Society of Automatic ControlModeling, Identification and Control0332-73531890-13281982-07-013313114910.4173/mic.1982.3.1Stochastic Seasonal Planning in Multireservoir Hydroelectric Power Systems by Differential Dynamic ProgrammingAnders GjelsvikA first-order differential dynamic programming (DDP) algorithm is used for computing optimal control for a five-reservoir system, where the stochastic inflow process has been approximated by a few discrete disturbance values in each time step. The method is found to be faster than linear programming, previously tried on the same system model. http://www.mic-journal.no/PDF/1982/MIC-1982-3-1.pdfPower systemwater resourcesstochastic optimizationincremental water valuedifferential dynamic programming |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Anders Gjelsvik |
spellingShingle |
Anders Gjelsvik Stochastic Seasonal Planning in Multireservoir Hydroelectric Power Systems by Differential Dynamic Programming Modeling, Identification and Control Power system water resources stochastic optimization incremental water value differential dynamic programming |
author_facet |
Anders Gjelsvik |
author_sort |
Anders Gjelsvik |
title |
Stochastic Seasonal Planning in Multireservoir Hydroelectric Power Systems by Differential Dynamic Programming |
title_short |
Stochastic Seasonal Planning in Multireservoir Hydroelectric Power Systems by Differential Dynamic Programming |
title_full |
Stochastic Seasonal Planning in Multireservoir Hydroelectric Power Systems by Differential Dynamic Programming |
title_fullStr |
Stochastic Seasonal Planning in Multireservoir Hydroelectric Power Systems by Differential Dynamic Programming |
title_full_unstemmed |
Stochastic Seasonal Planning in Multireservoir Hydroelectric Power Systems by Differential Dynamic Programming |
title_sort |
stochastic seasonal planning in multireservoir hydroelectric power systems by differential dynamic programming |
publisher |
Norwegian Society of Automatic Control |
series |
Modeling, Identification and Control |
issn |
0332-7353 1890-1328 |
publishDate |
1982-07-01 |
description |
A first-order differential dynamic programming (DDP) algorithm is used for computing optimal control for a five-reservoir system, where the stochastic inflow process has been approximated by a few discrete disturbance values in each time step. The method is found to be faster than linear programming, previously tried on the same system model. |
topic |
Power system water resources stochastic optimization incremental water value differential dynamic programming |
url |
http://www.mic-journal.no/PDF/1982/MIC-1982-3-1.pdf |
work_keys_str_mv |
AT andersgjelsvik stochasticseasonalplanninginmultireservoirhydroelectricpowersystemsbydifferentialdynamicprogramming |
_version_ |
1725259095979589632 |