APLIKASI OVERALL EQUIPMENT EFFECTIVENESS (OEE) DALAM UPAYA MENGATASI TINGGINYA DOWNTIME PADA STASIUN KETEL DI PG X JAWA TIMUR
PG X in Jember is one of the agro-industries that processing sugar cane into sugar crystals. This factory works seasonally. To ensure the consumer demand for sugar, the sugar factory should operate efficiently during their production season. In fact, it was found that at the downtime at the boiler d...
Main Author: | Mahros Darsin |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Universitas Muhammadiyah Ponorogo
2020-01-01
|
Series: | Multitek Indonesia |
Subjects: | |
Online Access: | http://journal.umpo.ac.id/index.php/multitek/article/view/1614 |
Similar Items
-
A preliminary report on the testing of the possibility of the in-house produced circuit for destroying the used evacuated two-ended needle, an invention
by: V Wiwanitkit, et al.
Published: (2002-12-01) -
Six sigma-based optimization model in hauling cut and fill exploitation activities to reduce downtime in underground mines in Peru
by: Rojas, Kevin, et al.
Published: (2021) -
Weather downtime analysis for cutter suction dredgers.
by: Thomaz Martino Tessler
Published: (2016) -
Weather downtime analysis for cutter suction dredgers.
by: Tessler, Thomaz Martino
Published: (2016) -
Rapid Loss Modeling of Death and Downtime Caused By Earthquake Induced Damage to Structures
by: Ghorawat, Sandeep
Published: (2012)