Measurement of Straightness and Verticality of Sheet Piling
Sheet piling is commonly used in various areas of special construction. Embedded in the ground before carrying out excavation works, sheet piling constitutes an enclosure and protection for the designed excavation. It is a temporary enclosure and protection for excavations made for communication str...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2020-09-01
|
Series: | Civil and Environmental Engineering Reports |
Subjects: | |
Online Access: | https://doi.org/10.2478/ceer-2020-0045 |
id |
doaj-e752bfb25765477ca23175af77d45ed1 |
---|---|
record_format |
Article |
spelling |
doaj-e752bfb25765477ca23175af77d45ed12021-09-06T19:22:03ZengSciendoCivil and Environmental Engineering Reports2080-51872450-85942020-09-0130328129410.2478/ceer-2020-0045ceer-2020-0045Measurement of Straightness and Verticality of Sheet PilingKokoszka Wanda0Ochab Piotr1Gardzinska Anna2Rzeszow University of Technology, Rzeszów, PolandRzeszow University of Technology, Rzeszów, PolandRzeszow University of Technology, Rzeszów, PolandSheet piling is commonly used in various areas of special construction. Embedded in the ground before carrying out excavation works, sheet piling constitutes an enclosure and protection for the designed excavation. It is a temporary enclosure and protection for excavations made for communication structures, launch shafts built for microtunnel construction, etc. In order to assess the quality of the engineering works related to the construction of sheet piling, measurements were made of straightness and verticality of the sheet piling used for the technological chambers. The measurements concerned two technological chambers of 7.2 and 6.4 m height. Inventory measurements were made using a total station of 1” accuracy and a leveling staff with the appliance of the so-called projection method. The two technological chambers were built in the investment area called “Infrastructure construction for rainwater drainage, water supply and sanitary sewage collection from the John Paul II International Airport Kraków-Balice.”https://doi.org/10.2478/ceer-2020-0045sheet pilingstraightness and verticality measurementaccuracy analysis |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Kokoszka Wanda Ochab Piotr Gardzinska Anna |
spellingShingle |
Kokoszka Wanda Ochab Piotr Gardzinska Anna Measurement of Straightness and Verticality of Sheet Piling Civil and Environmental Engineering Reports sheet piling straightness and verticality measurement accuracy analysis |
author_facet |
Kokoszka Wanda Ochab Piotr Gardzinska Anna |
author_sort |
Kokoszka Wanda |
title |
Measurement of Straightness and Verticality of Sheet Piling |
title_short |
Measurement of Straightness and Verticality of Sheet Piling |
title_full |
Measurement of Straightness and Verticality of Sheet Piling |
title_fullStr |
Measurement of Straightness and Verticality of Sheet Piling |
title_full_unstemmed |
Measurement of Straightness and Verticality of Sheet Piling |
title_sort |
measurement of straightness and verticality of sheet piling |
publisher |
Sciendo |
series |
Civil and Environmental Engineering Reports |
issn |
2080-5187 2450-8594 |
publishDate |
2020-09-01 |
description |
Sheet piling is commonly used in various areas of special construction. Embedded in the ground before carrying out excavation works, sheet piling constitutes an enclosure and protection for the designed excavation. It is a temporary enclosure and protection for excavations made for communication structures, launch shafts built for microtunnel construction, etc. In order to assess the quality of the engineering works related to the construction of sheet piling, measurements were made of straightness and verticality of the sheet piling used for the technological chambers. The measurements concerned two technological chambers of 7.2 and 6.4 m height. Inventory measurements were made using a total station of 1” accuracy and a leveling staff with the appliance of the so-called projection method. The two technological chambers were built in the investment area called “Infrastructure construction for rainwater drainage, water supply and sanitary sewage collection from the John Paul II International Airport Kraków-Balice.” |
topic |
sheet piling straightness and verticality measurement accuracy analysis |
url |
https://doi.org/10.2478/ceer-2020-0045 |
work_keys_str_mv |
AT kokoszkawanda measurementofstraightnessandverticalityofsheetpiling AT ochabpiotr measurementofstraightnessandverticalityofsheetpiling AT gardzinskaanna measurementofstraightnessandverticalityofsheetpiling |
_version_ |
1717772839232208896 |