Measurement of Straightness and Verticality of Sheet Piling

Sheet piling is commonly used in various areas of special construction. Embedded in the ground before carrying out excavation works, sheet piling constitutes an enclosure and protection for the designed excavation. It is a temporary enclosure and protection for excavations made for communication str...

Full description

Bibliographic Details
Main Authors: Kokoszka Wanda, Ochab Piotr, Gardzinska Anna
Format: Article
Language:English
Published: Sciendo 2020-09-01
Series:Civil and Environmental Engineering Reports
Subjects:
Online Access:https://doi.org/10.2478/ceer-2020-0045
id doaj-e752bfb25765477ca23175af77d45ed1
record_format Article
spelling doaj-e752bfb25765477ca23175af77d45ed12021-09-06T19:22:03ZengSciendoCivil and Environmental Engineering Reports2080-51872450-85942020-09-0130328129410.2478/ceer-2020-0045ceer-2020-0045Measurement of Straightness and Verticality of Sheet PilingKokoszka Wanda0Ochab Piotr1Gardzinska Anna2Rzeszow University of Technology, Rzeszów, PolandRzeszow University of Technology, Rzeszów, PolandRzeszow University of Technology, Rzeszów, PolandSheet piling is commonly used in various areas of special construction. Embedded in the ground before carrying out excavation works, sheet piling constitutes an enclosure and protection for the designed excavation. It is a temporary enclosure and protection for excavations made for communication structures, launch shafts built for microtunnel construction, etc. In order to assess the quality of the engineering works related to the construction of sheet piling, measurements were made of straightness and verticality of the sheet piling used for the technological chambers. The measurements concerned two technological chambers of 7.2 and 6.4 m height. Inventory measurements were made using a total station of 1” accuracy and a leveling staff with the appliance of the so-called projection method. The two technological chambers were built in the investment area called “Infrastructure construction for rainwater drainage, water supply and sanitary sewage collection from the John Paul II International Airport Kraków-Balice.”https://doi.org/10.2478/ceer-2020-0045sheet pilingstraightness and verticality measurementaccuracy analysis
collection DOAJ
language English
format Article
sources DOAJ
author Kokoszka Wanda
Ochab Piotr
Gardzinska Anna
spellingShingle Kokoszka Wanda
Ochab Piotr
Gardzinska Anna
Measurement of Straightness and Verticality of Sheet Piling
Civil and Environmental Engineering Reports
sheet piling
straightness and verticality measurement
accuracy analysis
author_facet Kokoszka Wanda
Ochab Piotr
Gardzinska Anna
author_sort Kokoszka Wanda
title Measurement of Straightness and Verticality of Sheet Piling
title_short Measurement of Straightness and Verticality of Sheet Piling
title_full Measurement of Straightness and Verticality of Sheet Piling
title_fullStr Measurement of Straightness and Verticality of Sheet Piling
title_full_unstemmed Measurement of Straightness and Verticality of Sheet Piling
title_sort measurement of straightness and verticality of sheet piling
publisher Sciendo
series Civil and Environmental Engineering Reports
issn 2080-5187
2450-8594
publishDate 2020-09-01
description Sheet piling is commonly used in various areas of special construction. Embedded in the ground before carrying out excavation works, sheet piling constitutes an enclosure and protection for the designed excavation. It is a temporary enclosure and protection for excavations made for communication structures, launch shafts built for microtunnel construction, etc. In order to assess the quality of the engineering works related to the construction of sheet piling, measurements were made of straightness and verticality of the sheet piling used for the technological chambers. The measurements concerned two technological chambers of 7.2 and 6.4 m height. Inventory measurements were made using a total station of 1” accuracy and a leveling staff with the appliance of the so-called projection method. The two technological chambers were built in the investment area called “Infrastructure construction for rainwater drainage, water supply and sanitary sewage collection from the John Paul II International Airport Kraków-Balice.”
topic sheet piling
straightness and verticality measurement
accuracy analysis
url https://doi.org/10.2478/ceer-2020-0045
work_keys_str_mv AT kokoszkawanda measurementofstraightnessandverticalityofsheetpiling
AT ochabpiotr measurementofstraightnessandverticalityofsheetpiling
AT gardzinskaanna measurementofstraightnessandverticalityofsheetpiling
_version_ 1717772839232208896