The project design of closure with cofferdam in a large reclamation project
The closure of the reclamation project generally requires that the sluice has been built and can be normally opened and closed for drainage. There is a large amount of follow-up work after closured of this project. In order to reach the safe flood control standard for the next typhoon season after t...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/69/e3sconf_gceece2021_02034.pdf |
id |
doaj-e7b1c9e29fa44ec387ff2dd133fed54b |
---|---|
record_format |
Article |
spelling |
doaj-e7b1c9e29fa44ec387ff2dd133fed54b2021-07-26T09:01:56ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012930203410.1051/e3sconf/202129302034e3sconf_gceece2021_02034The project design of closure with cofferdam in a large reclamation projectJin Hai-Sheng0Xu Ji1Ge Guo-Chang2Wenzhou Oufei development and Construction Investment Group Co., Ltd.Zhejiang Design Institute of water conservancy & Hydro-electric powerZhejiang Guangchuan Engineering Consultation Co., Ltd.The closure of the reclamation project generally requires that the sluice has been built and can be normally opened and closed for drainage. There is a large amount of follow-up work after closured of this project. In order to reach the safe flood control standard for the next typhoon season after the closure, reduce the flood control risk, and strive for sufficient time for the subsequent construction of the seawall, it is necessary to closure in advance under the condition that the sluice has not yet been opened. Therefore, this project demonstrated the feasibility of the closure with cofferdam based on the premise of think outside the box and theoretical calculation. The successful completion and acceptance of the reclamation project proved that the project is successful.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/69/e3sconf_gceece2021_02034.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Jin Hai-Sheng Xu Ji Ge Guo-Chang |
spellingShingle |
Jin Hai-Sheng Xu Ji Ge Guo-Chang The project design of closure with cofferdam in a large reclamation project E3S Web of Conferences |
author_facet |
Jin Hai-Sheng Xu Ji Ge Guo-Chang |
author_sort |
Jin Hai-Sheng |
title |
The project design of closure with cofferdam in a large reclamation project |
title_short |
The project design of closure with cofferdam in a large reclamation project |
title_full |
The project design of closure with cofferdam in a large reclamation project |
title_fullStr |
The project design of closure with cofferdam in a large reclamation project |
title_full_unstemmed |
The project design of closure with cofferdam in a large reclamation project |
title_sort |
project design of closure with cofferdam in a large reclamation project |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
The closure of the reclamation project generally requires that the sluice has been built and can be normally opened and closed for drainage. There is a large amount of follow-up work after closured of this project. In order to reach the safe flood control standard for the next typhoon season after the closure, reduce the flood control risk, and strive for sufficient time for the subsequent construction of the seawall, it is necessary to closure in advance under the condition that the sluice has not yet been opened. Therefore, this project demonstrated the feasibility of the closure with cofferdam based on the premise of think outside the box and theoretical calculation. The successful completion and acceptance of the reclamation project proved that the project is successful. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/69/e3sconf_gceece2021_02034.pdf |
work_keys_str_mv |
AT jinhaisheng theprojectdesignofclosurewithcofferdaminalargereclamationproject AT xuji theprojectdesignofclosurewithcofferdaminalargereclamationproject AT geguochang theprojectdesignofclosurewithcofferdaminalargereclamationproject AT jinhaisheng projectdesignofclosurewithcofferdaminalargereclamationproject AT xuji projectdesignofclosurewithcofferdaminalargereclamationproject AT geguochang projectdesignofclosurewithcofferdaminalargereclamationproject |
_version_ |
1721281910740615168 |