The project design of closure with cofferdam in a large reclamation project

The closure of the reclamation project generally requires that the sluice has been built and can be normally opened and closed for drainage. There is a large amount of follow-up work after closured of this project. In order to reach the safe flood control standard for the next typhoon season after t...

Full description

Bibliographic Details
Main Authors: Jin Hai-Sheng, Xu Ji, Ge Guo-Chang
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/69/e3sconf_gceece2021_02034.pdf
id doaj-e7b1c9e29fa44ec387ff2dd133fed54b
record_format Article
spelling doaj-e7b1c9e29fa44ec387ff2dd133fed54b2021-07-26T09:01:56ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012930203410.1051/e3sconf/202129302034e3sconf_gceece2021_02034The project design of closure with cofferdam in a large reclamation projectJin Hai-Sheng0Xu Ji1Ge Guo-Chang2Wenzhou Oufei development and Construction Investment Group Co., Ltd.Zhejiang Design Institute of water conservancy & Hydro-electric powerZhejiang Guangchuan Engineering Consultation Co., Ltd.The closure of the reclamation project generally requires that the sluice has been built and can be normally opened and closed for drainage. There is a large amount of follow-up work after closured of this project. In order to reach the safe flood control standard for the next typhoon season after the closure, reduce the flood control risk, and strive for sufficient time for the subsequent construction of the seawall, it is necessary to closure in advance under the condition that the sluice has not yet been opened. Therefore, this project demonstrated the feasibility of the closure with cofferdam based on the premise of think outside the box and theoretical calculation. The successful completion and acceptance of the reclamation project proved that the project is successful.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/69/e3sconf_gceece2021_02034.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Jin Hai-Sheng
Xu Ji
Ge Guo-Chang
spellingShingle Jin Hai-Sheng
Xu Ji
Ge Guo-Chang
The project design of closure with cofferdam in a large reclamation project
E3S Web of Conferences
author_facet Jin Hai-Sheng
Xu Ji
Ge Guo-Chang
author_sort Jin Hai-Sheng
title The project design of closure with cofferdam in a large reclamation project
title_short The project design of closure with cofferdam in a large reclamation project
title_full The project design of closure with cofferdam in a large reclamation project
title_fullStr The project design of closure with cofferdam in a large reclamation project
title_full_unstemmed The project design of closure with cofferdam in a large reclamation project
title_sort project design of closure with cofferdam in a large reclamation project
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2021-01-01
description The closure of the reclamation project generally requires that the sluice has been built and can be normally opened and closed for drainage. There is a large amount of follow-up work after closured of this project. In order to reach the safe flood control standard for the next typhoon season after the closure, reduce the flood control risk, and strive for sufficient time for the subsequent construction of the seawall, it is necessary to closure in advance under the condition that the sluice has not yet been opened. Therefore, this project demonstrated the feasibility of the closure with cofferdam based on the premise of think outside the box and theoretical calculation. The successful completion and acceptance of the reclamation project proved that the project is successful.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/69/e3sconf_gceece2021_02034.pdf
work_keys_str_mv AT jinhaisheng theprojectdesignofclosurewithcofferdaminalargereclamationproject
AT xuji theprojectdesignofclosurewithcofferdaminalargereclamationproject
AT geguochang theprojectdesignofclosurewithcofferdaminalargereclamationproject
AT jinhaisheng projectdesignofclosurewithcofferdaminalargereclamationproject
AT xuji projectdesignofclosurewithcofferdaminalargereclamationproject
AT geguochang projectdesignofclosurewithcofferdaminalargereclamationproject
_version_ 1721281910740615168