A survey in the resource-constrained project and multi-project scheduling problems ,
Resource-Constrained Project and Multi-Project Scheduling Problems (RCPSPs and RCMPSPs) have been essential topics of study over the last three decades. Both prob-lems consist of activities that must be scheduled subject to precedence and resource constraints. This paper surveys studies of RCPSPs an...
Main Authors: | Samer Ben Issa, Yiliu Tu |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2020-01-01
|
Series: | Journal of Project Management |
Subjects: | |
Online Access: | http://www.growingscience.com/jpm/Vol5/jpm_2019_26.pdf |
Similar Items
-
New procedures with new activity assumptions for solving resource constrained project scheduling problems
by: Samer Ben Issa, et al.
Published: (2020-01-01) -
Integrated multi-resource planning and scheduling in engineering project
by: Samer Ben Issa, et al.
Published: (2017-01-01) -
Integrating Schedule Risk Analysis with Multi-Skilled Resource Scheduling to Improve Resource-Constrained Project Scheduling Problems
by: Muritala Adebayo Isah, et al.
Published: (2021-01-01) -
A-Team Solving Distributed Resource-Constrained Multi-Project Scheduling Problem
by: Piotr Jędrzejowicz, et al.
Published: (2019-11-01) -
Relevance and Applicability of Multi-objective Resource Constrained Project Scheduling Problem: Review Article
by: V. Oladokun, et al.
Published: (2011-12-01)