Exergy costing analysis and performance evaluation of selected gas turbine power plants

In this study, exergy costing analysis and performance evaluation of selected gas turbine power plants in Nigeria are carried out. The results of exergy analysis confirmed that the combustion chamber is the most exergy destructive component compared to other cycle components. The exergetic efficienc...

Full description

Bibliographic Details
Main Authors: S.O. Oyedepo, R.O. Fagbenle, S.S. Adefila, Md.Mahbub Alam
Format: Article
Language:English
Published: Taylor & Francis Group 2015-12-01
Series:Cogent Engineering
Subjects:
Online Access:http://dx.doi.org/10.1080/23311916.2015.1101048
id doaj-ebd12d60e0764aa78c33ea4d80dc002c
record_format Article
spelling doaj-ebd12d60e0764aa78c33ea4d80dc002c2020-11-24T21:18:21ZengTaylor & Francis GroupCogent Engineering2331-19162015-12-012110.1080/23311916.2015.11010481101048Exergy costing analysis and performance evaluation of selected gas turbine power plantsS.O. Oyedepo0R.O. Fagbenle1S.S. Adefila2Md.Mahbub Alam3Covenant UniversityObafemi Awolowo UniversityCovenant UniversityInstitute for Turbulence-Noise-Vibration Interaction and Control, Shenzhen Graduate School, Harbin Institute of TechnologyIn this study, exergy costing analysis and performance evaluation of selected gas turbine power plants in Nigeria are carried out. The results of exergy analysis confirmed that the combustion chamber is the most exergy destructive component compared to other cycle components. The exergetic efficiency of the plants was found to depend significantly on a change in gas turbine inlet temperature (GTIT). The increase in exergetic efficiency with the increase in turbine inlet temperature is limited by turbine material temperature limit. This was observed from the plant efficiency defect curve. As the turbine inlet temperature increases, the plant efficiency defect decreases to minimum value at certain GTIT (1,200 K), after which it increases with GTIT. This shows degradation in performance of gas turbine plant at high turbine inlet temperature. Exergy costing analysis shows that the combustion chamber has the greatest cost of exergy destruction compared to other components. Increasing the GTIT, both the exergy destruction and the cost of exergy destruction of this component are found to decrease. Also, from exergy costing analysis, the unit cost of electricity produced in the power plants varies from cents 1.99/kWh (N3.16/kWh) to cents 5.65/kWh (N8.98/kWh).http://dx.doi.org/10.1080/23311916.2015.1101048exergy analysiseconomic analysisgas turbineexergy costlevelized costF-ruleP-rule
collection DOAJ
language English
format Article
sources DOAJ
author S.O. Oyedepo
R.O. Fagbenle
S.S. Adefila
Md.Mahbub Alam
spellingShingle S.O. Oyedepo
R.O. Fagbenle
S.S. Adefila
Md.Mahbub Alam
Exergy costing analysis and performance evaluation of selected gas turbine power plants
Cogent Engineering
exergy analysis
economic analysis
gas turbine
exergy cost
levelized cost
F-rule
P-rule
author_facet S.O. Oyedepo
R.O. Fagbenle
S.S. Adefila
Md.Mahbub Alam
author_sort S.O. Oyedepo
title Exergy costing analysis and performance evaluation of selected gas turbine power plants
title_short Exergy costing analysis and performance evaluation of selected gas turbine power plants
title_full Exergy costing analysis and performance evaluation of selected gas turbine power plants
title_fullStr Exergy costing analysis and performance evaluation of selected gas turbine power plants
title_full_unstemmed Exergy costing analysis and performance evaluation of selected gas turbine power plants
title_sort exergy costing analysis and performance evaluation of selected gas turbine power plants
publisher Taylor & Francis Group
series Cogent Engineering
issn 2331-1916
publishDate 2015-12-01
description In this study, exergy costing analysis and performance evaluation of selected gas turbine power plants in Nigeria are carried out. The results of exergy analysis confirmed that the combustion chamber is the most exergy destructive component compared to other cycle components. The exergetic efficiency of the plants was found to depend significantly on a change in gas turbine inlet temperature (GTIT). The increase in exergetic efficiency with the increase in turbine inlet temperature is limited by turbine material temperature limit. This was observed from the plant efficiency defect curve. As the turbine inlet temperature increases, the plant efficiency defect decreases to minimum value at certain GTIT (1,200 K), after which it increases with GTIT. This shows degradation in performance of gas turbine plant at high turbine inlet temperature. Exergy costing analysis shows that the combustion chamber has the greatest cost of exergy destruction compared to other components. Increasing the GTIT, both the exergy destruction and the cost of exergy destruction of this component are found to decrease. Also, from exergy costing analysis, the unit cost of electricity produced in the power plants varies from cents 1.99/kWh (N3.16/kWh) to cents 5.65/kWh (N8.98/kWh).
topic exergy analysis
economic analysis
gas turbine
exergy cost
levelized cost
F-rule
P-rule
url http://dx.doi.org/10.1080/23311916.2015.1101048
work_keys_str_mv AT sooyedepo exergycostinganalysisandperformanceevaluationofselectedgasturbinepowerplants
AT rofagbenle exergycostinganalysisandperformanceevaluationofselectedgasturbinepowerplants
AT ssadefila exergycostinganalysisandperformanceevaluationofselectedgasturbinepowerplants
AT mdmahbubalam exergycostinganalysisandperformanceevaluationofselectedgasturbinepowerplants
_version_ 1726009720932663296