Performance Improvement using Simulation Tool in a Tiles Production Facility

In recent times, the globalization of markets due to the improvement of utilization of resources has significant impact on the manufacturing systems. International competition forced companies to establish efficient and effective production facilities that provide best possible outcome in terms of p...

Full description

Bibliographic Details
Main Authors: Uroosa Nadir, Tufail Habib, Sikandar Bilal Khattak, Ishrat Noor
Format: Article
Language:English
Published: Mehran University of Engineering and Technology 2020-01-01
Series:Mehran University Research Journal of Engineering and Technology
Online Access:https://publications.muet.edu.pk/index.php/muetrj/article/view/1416
id doaj-ec881e3d9a604b9c904def201a5dde55
record_format Article
spelling doaj-ec881e3d9a604b9c904def201a5dde552020-11-25T02:50:45ZengMehran University of Engineering and TechnologyMehran University Research Journal of Engineering and Technology0254-78212413-72192020-01-0139111713210.22581/muet1982.2001.121416Performance Improvement using Simulation Tool in a Tiles Production FacilityUroosa NadirTufail HabibSikandar Bilal KhattakIshrat Noor0inoor@uetpeshawar.edu.pk)In recent times, the globalization of markets due to the improvement of utilization of resources has significant impact on the manufacturing systems. International competition forced companies to establish efficient and effective production facilities that provide best possible outcome in terms of profitability, throughput and lead time. In this background, every industrial facility is in competition to remain competitive in the market and be flexible for future changes. It is not easy to change the environment of any facility in order to check the results beforehand therefore simulation is a viable option. Simulation tools are used to help analyze performance measures for improvement. This paper presents a case by analyzing a facility in order to improve its production using simulation tool. In this study, simulation model for the production facility of Fort Ceramic Company is developed from its current state and then changes are made to its inter-arrival time. Models for both improved and current systems are developed in the simulation tool. Data analyzed in the simulation tool shows better results that represent a significant improvement in productivity, cycle time and throughput time to optimizethe system.It is also observed that by decreasing the inter arrival time there is increase in the throughput which improves the revenue.https://publications.muet.edu.pk/index.php/muetrj/article/view/1416
collection DOAJ
language English
format Article
sources DOAJ
author Uroosa Nadir
Tufail Habib
Sikandar Bilal Khattak
Ishrat Noor
spellingShingle Uroosa Nadir
Tufail Habib
Sikandar Bilal Khattak
Ishrat Noor
Performance Improvement using Simulation Tool in a Tiles Production Facility
Mehran University Research Journal of Engineering and Technology
author_facet Uroosa Nadir
Tufail Habib
Sikandar Bilal Khattak
Ishrat Noor
author_sort Uroosa Nadir
title Performance Improvement using Simulation Tool in a Tiles Production Facility
title_short Performance Improvement using Simulation Tool in a Tiles Production Facility
title_full Performance Improvement using Simulation Tool in a Tiles Production Facility
title_fullStr Performance Improvement using Simulation Tool in a Tiles Production Facility
title_full_unstemmed Performance Improvement using Simulation Tool in a Tiles Production Facility
title_sort performance improvement using simulation tool in a tiles production facility
publisher Mehran University of Engineering and Technology
series Mehran University Research Journal of Engineering and Technology
issn 0254-7821
2413-7219
publishDate 2020-01-01
description In recent times, the globalization of markets due to the improvement of utilization of resources has significant impact on the manufacturing systems. International competition forced companies to establish efficient and effective production facilities that provide best possible outcome in terms of profitability, throughput and lead time. In this background, every industrial facility is in competition to remain competitive in the market and be flexible for future changes. It is not easy to change the environment of any facility in order to check the results beforehand therefore simulation is a viable option. Simulation tools are used to help analyze performance measures for improvement. This paper presents a case by analyzing a facility in order to improve its production using simulation tool. In this study, simulation model for the production facility of Fort Ceramic Company is developed from its current state and then changes are made to its inter-arrival time. Models for both improved and current systems are developed in the simulation tool. Data analyzed in the simulation tool shows better results that represent a significant improvement in productivity, cycle time and throughput time to optimizethe system.It is also observed that by decreasing the inter arrival time there is increase in the throughput which improves the revenue.
url https://publications.muet.edu.pk/index.php/muetrj/article/view/1416
work_keys_str_mv AT uroosanadir performanceimprovementusingsimulationtoolinatilesproductionfacility
AT tufailhabib performanceimprovementusingsimulationtoolinatilesproductionfacility
AT sikandarbilalkhattak performanceimprovementusingsimulationtoolinatilesproductionfacility
AT ishratnoor performanceimprovementusingsimulationtoolinatilesproductionfacility
_version_ 1724736583057276928