Snow controls to reduce snow drifts at Syowa Station

Snow controls were employed to reduce snow drifts around buildings and a main road during the period of the 53rd Japanese Antarctic Research Expedition (JARE-53) wintering party at Syowa Station. Snow and ice that accumulated under the elevated areaway of a sewage treatment building were removed and...

Full description

Bibliographic Details
Main Author: Kenji Ishizawa
Format: Article
Language:English
Published: National Institute of Polar Research 2014-03-01
Series:Antarctic Record
Online Access:http://doi.org/10.15094/00009725
id doaj-eddaa025841e43eeb14c950db897dff9
record_format Article
spelling doaj-eddaa025841e43eeb14c950db897dff92020-11-24T21:41:03ZengNational Institute of Polar ResearchAntarctic Record0085-72892432-079X2014-03-01581527010.15094/00009725Snow controls to reduce snow drifts at Syowa StationKenji Ishizawa0National Institute of Polar ResearchSnow controls were employed to reduce snow drifts around buildings and a main road during the period of the 53rd Japanese Antarctic Research Expedition (JARE-53) wintering party at Syowa Station. Snow and ice that accumulated under the elevated areaway of a sewage treatment building were removed and a blower fence was erected. Wind passages under highfloored buildings were maintained by cutting openings through snow drifts that developed on the leeward side of the buildings. Empty drums were useful as wind ducts to prevent snow drifts from accumulating in front of doors of small huts. Snow removed from along a main road was relocated on the leeward side of the road to prevent the subsequent accumulation of snow drifts.http://doi.org/10.15094/00009725
collection DOAJ
language English
format Article
sources DOAJ
author Kenji Ishizawa
spellingShingle Kenji Ishizawa
Snow controls to reduce snow drifts at Syowa Station
Antarctic Record
author_facet Kenji Ishizawa
author_sort Kenji Ishizawa
title Snow controls to reduce snow drifts at Syowa Station
title_short Snow controls to reduce snow drifts at Syowa Station
title_full Snow controls to reduce snow drifts at Syowa Station
title_fullStr Snow controls to reduce snow drifts at Syowa Station
title_full_unstemmed Snow controls to reduce snow drifts at Syowa Station
title_sort snow controls to reduce snow drifts at syowa station
publisher National Institute of Polar Research
series Antarctic Record
issn 0085-7289
2432-079X
publishDate 2014-03-01
description Snow controls were employed to reduce snow drifts around buildings and a main road during the period of the 53rd Japanese Antarctic Research Expedition (JARE-53) wintering party at Syowa Station. Snow and ice that accumulated under the elevated areaway of a sewage treatment building were removed and a blower fence was erected. Wind passages under highfloored buildings were maintained by cutting openings through snow drifts that developed on the leeward side of the buildings. Empty drums were useful as wind ducts to prevent snow drifts from accumulating in front of doors of small huts. Snow removed from along a main road was relocated on the leeward side of the road to prevent the subsequent accumulation of snow drifts.
url http://doi.org/10.15094/00009725
work_keys_str_mv AT kenjiishizawa snowcontrolstoreducesnowdriftsatsyowastation
_version_ 1725923423719260160