Optimizing the cut off grade in Sarcheshmeh copper mine using Lane Quartet Model
Lane Algorithm is used to determine optimum cut off grade for a mining operation. There may be three parts in each operation: mining, concentration and refining. In Sarcheshmeh Copper Mine the concentrate coming from the stock has the average grade in addition to the production rate and cost. Theref...
Main Authors: | Maleki B., Mozaffari E., Mahdavipour M.J. |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Belgrade, Technical Faculty Bor
2016-01-01
|
Series: | Journal of Mining and Metallurgy. Section A: Mining |
Subjects: | |
Online Access: | http://scindeks-clanci.ceon.rs/data/pdf/1450-5959/2016/1450-59591601027M.pdf |
Similar Items
-
Leaching Optimization of Sarcheshmeh Copper Concentrate by Application of Taguchi Experimental Design Method
by: Saeid Zandvakili, et al.
Published: (2020-12-01) -
Bio-Remediation of Acid Mine Drainage in the Sarcheshmeh Porphyry Copper Mine by Fungi: Batch and Fixed Bed Process
by: Hanieh Soleimanifar, et al.
Published: (2012-12-01) -
Investigation of character variations and its relationship with fatigue and job involvement among employees of Melting unit in Sarcheshmeh Copper Complex, Iran
by: Bahram Kouhnavard
Published: (2020-10-01) -
Petrology and tectonic settings of the Sarcheshmeh porphyry copper deposit with emphasis on granodiorite and quartz eye porphyry
by: Mohammad Maanijou, et al.
Published: (2020-11-01) -
Systematic sulfur stable isotope and fluid inclusion studies on veinlet groups in the Sarcheshmeh porphyry copper deposit: based on new data
by: Mohammad Maanijou, et al.
Published: (2012-10-01)