Minimization of direct costs in the construction of torrent control structures
The most important elements in the planning of the implementation of the torrent (flood) control projects which need to be estimated are time, costs (budget) and resource required. These three elements are interactive: a shorter duration of structure construction causes additional resources engageme...
Main Authors: | Nada Dragović, Mirjana Todosijević, Stanimir Kostadinov, Miodrag Zlatić, Tijana Vulević |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
2017-01-01
|
Series: | Tehnički Vjesnik |
Subjects: | |
Online Access: | https://hrcak.srce.hr/file/273542 |
Similar Items
-
Risk management of a torrential flood construction project using the Monte Carlo simulation
by: Baumgertel Aleksandar, et al.
Published: (2016-01-01) -
Labour engagement optimization in planning the execution of river regulation works on the Jelašnička river
by: Andrijanić Tijana, et al.
Published: (2012-01-01) -
Measurement and analysis of BitTorrent
by: Sadafal, Videsh
Published: (2008) -
Autorrepresentación en la obra de Torrente Ballester
by: Susana Arroyo Redondo
Published: (2012-06-01) -
The natural effects of transverse structures in Gabrovacka reka torrent
by: Velojić Miljan
Published: (2002-01-01)