Unit Commitment Accommodating Large Scale Green Power
As more clean energy sources contribute to the electrical grid, the stress on generation scheduling for peak-shaving increases. This is a concern in several provinces of China that have many nuclear power plants, such as Guangdong and Fujian. Studies on the unit commitment (UC) problem involving the...
Main Authors: | Yuntao Ju, Jiankai Wang, Fuchao Ge, Yi Lin, Mingyu Dong, Dezhi Li, Kun Shi, Haibo Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-04-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/9/8/1611 |
Similar Items
-
Unit Commitment Considering Interruptible Load for Power System Operation with Wind Power
by: Hyeon-Gon Park, et al.
Published: (2014-07-01) -
Economic Dispatch of Combined Heat and Power Energy Systems Using Electric Boiler to Accommodate Wind Power
by: Bo Liu, et al.
Published: (2020-01-01) -
Cost Analysis Method for Estimating Dynamic Reserve Considering Uncertainties in Supply and Demand
by: Kyung-bin Kwon, et al.
Published: (2016-10-01) -
Flexible Robust Risk-Constrained Unit Commitment of Power System Incorporating Large Scale Wind Generation and Energy Storage
by: Gaohang Zhang, et al.
Published: (2020-01-01) -
Robust Unit Commitment Including Frequency Stability Constraints
by: Felipe Pérez-Illanes, et al.
Published: (2016-11-01)