Clay-cement concrete diaphragm of the type "slurry wall" in the 100 meter high dam
In the article the authors estimate the possibility of building a high (100 m high) stone dam with clay-cement concrete diaphragm. This diaphragm is used as an antifiltering element and it is made of secant piles method of clay-cement concrete (method of "slurry wall"). This diaphragm shou...
Main Authors: | Radzinskiy Aleksandr Vladimirovich, Rasskazov Leonid Nikolaevich, Sainov Mikhail Petrovich |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | http://vestnikmgsu.ru/files/archive/issues/2014/9/ru/12.pdf |
Similar Items
-
Unilateral diaphragm paralysis: a dysfunction restricted not just to one hemidiaphragm
by: Mayra Caleffi-Pereira, et al.
Published: (2018-08-01) -
In vivo assessment of the diaphragm in young male healthy adults: occupation-based activity-related differences
by: Ogugua Augustine Egwu, et al.
Published: (2015-01-01) -
Safety assessment of a bored pile diaphragm in a medium-height dam
by: Sainov Mikhail Petrovich, et al.
Published: (2014-01-01) -
Deep Deck and Cellular Deck Diaphragm Strength and Stiffness Evaluation
by: Bagwell, Jonathan
Published: (2014) -
Horizontal Stiffness of Wood Diaphragms
by: Bott, James Wescott
Published: (2014)