Cross-Party Collaboration to Reduce Construction Waste to Design-Build Projects

Waste in the construction industry is a severe problem in various countries in the world, including in Indonesia. Several studies on construction projects over the last three years have found that the Construction Waste (CW) tendency has increased significantly. The objective of this study is to ide...

Full description

Bibliographic Details
Main Authors: Afrizal Nursin, Yusuf Latief, Krishna Muchtar
Format: Article
Language:English
Published: Universitas Indonesia 2018-07-01
Series:International Journal of Technology
Subjects:
Online Access:http://ijtech.eng.ui.ac.id/article/view/1819
id doaj-fa9958d650864de79731e6b5ab05861a
record_format Article
spelling doaj-fa9958d650864de79731e6b5ab05861a2020-11-25T00:48:27ZengUniversitas IndonesiaInternational Journal of Technology2086-96142087-21002018-07-019475176510.14716/ijtech.v9i4.18191819Cross-Party Collaboration to Reduce Construction Waste to Design-Build ProjectsAfrizal Nursin0Yusuf Latief1Krishna Muchtar2- Engineering Faculty,University of Indonesia<br/>-Engineering Faculty University of IndonesiaEngineering Faculty University of IndonesiaWaste in the construction industry is a severe problem in various countries in the world, including in Indonesia. Several studies on construction projects over the last three years have found that the Construction Waste (CW) tendency has increased significantly. The objective of this study is to identify existing CW in design-build project and how it can be reduced by increasing collaboration between the stakeholders involved in such projects. The survey method is used to explore and find solutions to the CW problems, and to reduce it by increasing collaboration. Data were obtained from 127 respondents working on a design-build construction project, then processed by using the SEM-PLS 3.0 Professional program to estimate the causal-predictive relationships between stakeholder, culture, communication, conflict, and the collaborative variables that affect the reduction in construction waste on design-build project. A collaborative model between the parties implemented by managing those involved, understanding the culture, minimizing conflict and improving communication, can reduce both physical waste and non-physical construction waste.http://ijtech.eng.ui.ac.id/article/view/1819CollaborationConflictConstruction wasteDesign-build
collection DOAJ
language English
format Article
sources DOAJ
author Afrizal Nursin
Yusuf Latief
Krishna Muchtar
spellingShingle Afrizal Nursin
Yusuf Latief
Krishna Muchtar
Cross-Party Collaboration to Reduce Construction Waste to Design-Build Projects
International Journal of Technology
Collaboration
Conflict
Construction waste
Design-build
author_facet Afrizal Nursin
Yusuf Latief
Krishna Muchtar
author_sort Afrizal Nursin
title Cross-Party Collaboration to Reduce Construction Waste to Design-Build Projects
title_short Cross-Party Collaboration to Reduce Construction Waste to Design-Build Projects
title_full Cross-Party Collaboration to Reduce Construction Waste to Design-Build Projects
title_fullStr Cross-Party Collaboration to Reduce Construction Waste to Design-Build Projects
title_full_unstemmed Cross-Party Collaboration to Reduce Construction Waste to Design-Build Projects
title_sort cross-party collaboration to reduce construction waste to design-build projects
publisher Universitas Indonesia
series International Journal of Technology
issn 2086-9614
2087-2100
publishDate 2018-07-01
description Waste in the construction industry is a severe problem in various countries in the world, including in Indonesia. Several studies on construction projects over the last three years have found that the Construction Waste (CW) tendency has increased significantly. The objective of this study is to identify existing CW in design-build project and how it can be reduced by increasing collaboration between the stakeholders involved in such projects. The survey method is used to explore and find solutions to the CW problems, and to reduce it by increasing collaboration. Data were obtained from 127 respondents working on a design-build construction project, then processed by using the SEM-PLS 3.0 Professional program to estimate the causal-predictive relationships between stakeholder, culture, communication, conflict, and the collaborative variables that affect the reduction in construction waste on design-build project. A collaborative model between the parties implemented by managing those involved, understanding the culture, minimizing conflict and improving communication, can reduce both physical waste and non-physical construction waste.
topic Collaboration
Conflict
Construction waste
Design-build
url http://ijtech.eng.ui.ac.id/article/view/1819
work_keys_str_mv AT afrizalnursin crosspartycollaborationtoreduceconstructionwastetodesignbuildprojects
AT yusuflatief crosspartycollaborationtoreduceconstructionwastetodesignbuildprojects
AT krishnamuchtar crosspartycollaborationtoreduceconstructionwastetodesignbuildprojects
_version_ 1725255937539702784