Monitoring and numerical analysis of pore water pressure changes Eyvashan dam during the first dewatering period

The performance of dams due to high operating costs and irreparable damages caused by failures in the construction phase and during the dewatering and exploitation period should verified and monitored by proper behavioural analysis. Dewatering the dams will result in the saturation of the embankment...

Full description

Bibliographic Details
Main Authors: Behrang Beiranvand, Mehdi Komasi
Format: Article
Language:English
Published: Razi University 2019-01-01
Series:Journal of Applied Research in Water and Wastewater
Subjects:
Online Access:https://arww.razi.ac.ir/article_1017_a232d262ff3ea5e7aa63a9217208065a.pdf

Similar Items