Monitoring and numerical analysis of pore water pressure changes Eyvashan dam during the first dewatering period
The performance of dams due to high operating costs and irreparable damages caused by failures in the construction phase and during the dewatering and exploitation period should verified and monitored by proper behavioural analysis. Dewatering the dams will result in the saturation of the embankment...
Main Authors: | Behrang Beiranvand, Mehdi Komasi |
---|---|
Format: | Article |
Language: | English |
Published: |
Razi University
2019-01-01
|
Series: | Journal of Applied Research in Water and Wastewater |
Subjects: | |
Online Access: | https://arww.razi.ac.ir/article_1017_a232d262ff3ea5e7aa63a9217208065a.pdf |
Similar Items
-
Environmental Impact Assessment of the Eyvashan Dam using the Leopold modified matrix and Rapid Impact Assessment Matrix (RIAM)
by: mehdi komasi, et al.
Published: (2019-08-01) -
Evaluation of behaviors of earth and rockfill dams during construction and initial impounding using instrumentation data and numerical modeling
by: Mohammad Rashidi, et al.
Published: (2017-08-01) -
Optimization of horizontal drain dimensions in heterogeneous earth dams using Artificial Neural Network (ANN): A case study on Marvak dam
by: Mehdi Komasi, et al.
Published: (2019-12-01) -
An Investigation of Excessive Seepage from the Al-Fulaij Recharge Dam, Oman
by: Y.E.A. Mohamedzein, et al.
Published: (2016-12-01) -
Combined fields (electro-osmosis and pressure) dewatering of kelp
by: Lightfoot, Dennis G. (Dennis George)
Published: (1991)