Guidelines for the preparation and submission of work schedule for construction project
The lack of standardised guidelines for the preparation and submission of work schedule has contributed to several problems in construction project especially the extra efforts that have to be put in before parties involved in the project accept the work plan. This paper explores the current practic...
Main Authors: | Mohamad Zin, Rosli (Author), Mohamad, Mohamad Ibrahim (Author), Mansur, Shaiful Amri (Author), Chan Donald, Bing Tee (Author) |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Civil Engineering, Universiti Teknologi Malaysia,
2008.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
A study on identifying factors affecting project performance on road construction project
by: Taufik, Mohamad
Published: (2012) -
Factors affecting the preparation of the construction work programme
by: Mohamad, Mardiana
Published: (2016) -
An overview of contract documents for building information modelling (BIM) construction projects
by: Abd. Jamil, Ahmad Huzaimi, et al.
Published: (2017) -
The structural behaviour of precast lightweight foamed concrete sandwich panel as a load bearing wall
by: Mohamad, Noridah
Published: (2010) -
An analysis of the effect of staircase intermediate landing floor on the evacuation time
by: Mohamad Yatim, Yahya
Published: (2008)