Design and principles of operation of a machine for setting slope stakes on highway construction
Main Author: | Thrash, Kenneth Matheson |
---|---|
Published: |
Georgia Institute of Technology
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/1853/24149 |
Similar Items
-
Construction production rate information system for highway projects
by: Chong, Wai Kiong Oswald
Published: (2008) -
Highway grading and drainage
by: Papageorge, George Thomas
Published: (2010) -
Highway earthwork and pavement production rates for construction time estimation
by: Kuo, Yao-chen
Published: (2008) -
Performance benchmarking of large highway projects
by: Shrestha, Pramen Prasad, 1964-
Published: (2008) -
The location, construction, and maintenance of public highways
by: Counselman, J. S.
Published: (2015)