Lot size scheduling problem with two level setup cost/time structure

Bibliographic Details
Main Author: Chung, Jae Hyun
Published: Georgia Institute of Technology 2008
Subjects:
Online Access:http://hdl.handle.net/1853/25591
id ndltd-GATECH-oai-smartech.gatech.edu-1853-25591
record_format oai_dc
spelling ndltd-GATECH-oai-smartech.gatech.edu-1853-255912013-12-15T03:41:05ZLot size scheduling problem with two level setup cost/time structureChung, Jae HyunEconomic lot sizeProduction schedulingGeorgia Institute of Technology2008-11-13T12:32:17Z2008-11-13T12:32:17Z1991-08Dissertationhttp://hdl.handle.net/1853/25591348011Access restricted to authorized Georgia Tech users only.
collection NDLTD
sources NDLTD
topic Economic lot size
Production scheduling
spellingShingle Economic lot size
Production scheduling
Chung, Jae Hyun
Lot size scheduling problem with two level setup cost/time structure
author Chung, Jae Hyun
author_facet Chung, Jae Hyun
author_sort Chung, Jae Hyun
title Lot size scheduling problem with two level setup cost/time structure
title_short Lot size scheduling problem with two level setup cost/time structure
title_full Lot size scheduling problem with two level setup cost/time structure
title_fullStr Lot size scheduling problem with two level setup cost/time structure
title_full_unstemmed Lot size scheduling problem with two level setup cost/time structure
title_sort lot size scheduling problem with two level setup cost/time structure
publisher Georgia Institute of Technology
publishDate 2008
url http://hdl.handle.net/1853/25591
work_keys_str_mv AT chungjaehyun lotsizeschedulingproblemwithtwolevelsetupcosttimestructure
_version_ 1716619356951019520