Battery storage system sizing evaluation for utility distribution asset investment deferral

Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, in conjunction with the Leaders for Global Operations Program at MIT, 2017. === Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, in conjunction with the Leaders for Global Ope...

Full description

Bibliographic Details
Main Author: Yuan, Sandy (Sandy Roan-Jane)
Other Authors: Georgia Perakis, James Kirtley and Konstantin Turitsyn.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2017
Subjects:
Online Access:http://hdl.handle.net/1721.1/111527
id ndltd-MIT-oai-dspace.mit.edu-1721.1-111527
record_format oai_dc
spelling ndltd-MIT-oai-dspace.mit.edu-1721.1-1115272019-05-02T15:50:49Z Battery storage system sizing evaluation for utility distribution asset investment deferral Yuan, Sandy (Sandy Roan-Jane) Georgia Perakis, James Kirtley and Konstantin Turitsyn. Leaders for Global Operations Program. Sloan School of Management. Massachusetts Institute of Technology. Department of Mechanical Engineering. Leaders for Global Operations Program. Sloan School of Management. Mechanical Engineering. Leaders for Global Operations Program. Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, in conjunction with the Leaders for Global Operations Program at MIT, 2017. Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, in conjunction with the Leaders for Global Operations Program at MIT, 2017. "June 2017." Cataloged from PDF version of thesis. Includes bibliographical references (pages 61-62). A need exists for systematic evaluation methods of battery storage sizing as an electric utility asset investment. Atlantic Electric, like many US utilities, has begun to consider battery energy storage systems for multiple applications, and will likely continue to evaluate potential investments in energy storage in the future. This thesis develops and evaluates three sizing methodologies for battery energy storage systems for a reliability application at an electric distribution substation. The methods are applied to three substation locations using real historical load data to understand the required supplemental capacity provided by on-site battery storage energy systems in situations of peak demand coinciding with N-1 contingency. The study also includes analysis of business processes for asset planning and recommendations. The results of the analysis indicate that deterministic conservative sizing methods, when compared to a probabilistic historical risk-based method, yield battery size that is significantly larger. The most conservative battery size, which would cover the most extreme capacity needs, is approximately twice the size of the risk-based battery size, which would cover approximately 80% of capacity need events. Going forward, the methodologies from this thesis can be developed further for evaluating battery storage systems for reliability applications among diverse conditions and use cases. Furthermore, integrating multiple use cases and potential value streams for battery storage systems in utility operations will involve cross-functional and comprehensive processes for evaluation in the future. by Sandy Yuan. M.B.A. S.M. 2017-09-15T15:38:07Z 2017-09-15T15:38:07Z 2017 Thesis http://hdl.handle.net/1721.1/111527 1003324384 eng MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission. http://dspace.mit.edu/handle/1721.1/7582 62 pages application/pdf Massachusetts Institute of Technology
collection NDLTD
language English
format Others
sources NDLTD
topic Sloan School of Management.
Mechanical Engineering.
Leaders for Global Operations Program.
spellingShingle Sloan School of Management.
Mechanical Engineering.
Leaders for Global Operations Program.
Yuan, Sandy (Sandy Roan-Jane)
Battery storage system sizing evaluation for utility distribution asset investment deferral
description Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, in conjunction with the Leaders for Global Operations Program at MIT, 2017. === Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, in conjunction with the Leaders for Global Operations Program at MIT, 2017. === "June 2017." Cataloged from PDF version of thesis. === Includes bibliographical references (pages 61-62). === A need exists for systematic evaluation methods of battery storage sizing as an electric utility asset investment. Atlantic Electric, like many US utilities, has begun to consider battery energy storage systems for multiple applications, and will likely continue to evaluate potential investments in energy storage in the future. This thesis develops and evaluates three sizing methodologies for battery energy storage systems for a reliability application at an electric distribution substation. The methods are applied to three substation locations using real historical load data to understand the required supplemental capacity provided by on-site battery storage energy systems in situations of peak demand coinciding with N-1 contingency. The study also includes analysis of business processes for asset planning and recommendations. The results of the analysis indicate that deterministic conservative sizing methods, when compared to a probabilistic historical risk-based method, yield battery size that is significantly larger. The most conservative battery size, which would cover the most extreme capacity needs, is approximately twice the size of the risk-based battery size, which would cover approximately 80% of capacity need events. Going forward, the methodologies from this thesis can be developed further for evaluating battery storage systems for reliability applications among diverse conditions and use cases. Furthermore, integrating multiple use cases and potential value streams for battery storage systems in utility operations will involve cross-functional and comprehensive processes for evaluation in the future. === by Sandy Yuan. === M.B.A. === S.M.
author2 Georgia Perakis, James Kirtley and Konstantin Turitsyn.
author_facet Georgia Perakis, James Kirtley and Konstantin Turitsyn.
Yuan, Sandy (Sandy Roan-Jane)
author Yuan, Sandy (Sandy Roan-Jane)
author_sort Yuan, Sandy (Sandy Roan-Jane)
title Battery storage system sizing evaluation for utility distribution asset investment deferral
title_short Battery storage system sizing evaluation for utility distribution asset investment deferral
title_full Battery storage system sizing evaluation for utility distribution asset investment deferral
title_fullStr Battery storage system sizing evaluation for utility distribution asset investment deferral
title_full_unstemmed Battery storage system sizing evaluation for utility distribution asset investment deferral
title_sort battery storage system sizing evaluation for utility distribution asset investment deferral
publisher Massachusetts Institute of Technology
publishDate 2017
url http://hdl.handle.net/1721.1/111527
work_keys_str_mv AT yuansandysandyroanjane batterystoragesystemsizingevaluationforutilitydistributionassetinvestmentdeferral
_version_ 1719029260165840896