Managing discovered scope within hybrid agile stage-gate project delivery systems

Thesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, System Design and Management Program, February, 2021 === Cataloged from the official version of thesis. === Includes bibliographical references (pages 83-84). === Complex mechatronic projects have machine functionalit...

Full description

Bibliographic Details
Main Author: Johnson, Thomas M. (Thomas Merle)
Other Authors: Massachusetts Institute of Technology. Engineering and Management Program.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2021
Subjects:
Online Access:https://hdl.handle.net/1721.1/132885
id ndltd-MIT-oai-dspace.mit.edu-1721.1-132885
record_format oai_dc
collection NDLTD
language English
format Others
sources NDLTD
topic Engineering and Management Program.
System Design and Management Program.
spellingShingle Engineering and Management Program.
System Design and Management Program.
Johnson, Thomas M. (Thomas Merle)
Managing discovered scope within hybrid agile stage-gate project delivery systems
description Thesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, System Design and Management Program, February, 2021 === Cataloged from the official version of thesis. === Includes bibliographical references (pages 83-84). === Complex mechatronic projects have machine functionality dependent upon substantial embedded software content delivered in coordination with the hardware componentry. This situation creates a dilemma for project leadership as they determine which methods to utilize for managing the project. One option is to utilize a hybrid approach where comingled Stage-Gate and Agile methods serve both hardware and software activities. However, the need for synchronized delivery schedules between the hardware and software components is not addressed well by Agile methods, which do not emphasize forward planning. In contrast, the uncertainty in defining software scope challenges the up-front scope definition relied upon by Stage-Gate methods. Three independently operating project delivery systems have each spent more than ten years weaving Agile software development methods into the classic Stage-Gate approaches to make their hybrid project management systems. This study interviews Agile and Stage-Gate leadership roles within each of these three project delivery systems to identify what has evolved to keep the schedule expectations for scope delivery aligned to the discovery of additional scope while software development progresses. This study finds that both the Stage-Gate and Agile leaders interviewed call for more work to be done in the project planning stage to improve the inclusion of more rigorous software scope identification activities. It also finds several differences in the design stage activities across the groups studied concerning how they accommodate the discovery of new software scope into the overall scope and schedule expectations for the project, each with a differing level of effectiveness. The most effective traits include the formalized identification and capture of the product decomposition and architecture so that it can be used to estimate software scope, schedule, and resources more accurately upfront in the planning stage. During the design stage, the most effective project delivery systems leverage the cultural acknowledgment and leadership's enforcement of the stakeholders' need to adjust their scope expectations in response to new scope discoveries. The addition of repeating two-month planning events deliver timely forecasts of software deliveries, and frequent scope management meetings allow for rapid adjustment to software scope discoveries. Each software delivery system added dedicated Software Delivery Lead roles to act as the liaison between the Agile and Stage-Gate management methods and to formulate mitigation activities with the rest of the functional area leads to the mechatronic product. Project delivery system developers may use these findings as a set of lessons learned to guide their pursuits with the integration of Agile practices into an existing Stage-Gate process. Others could build upon these findings by repeating the activity with other case studies to see if a pattern emerges, which could guide the creation of more specific Agile Stage-Gate frameworks. === by Thomas M. Johnson. === S.M. in Engineering and Management === S.M.inEngineeringandManagement Massachusetts Institute of Technology, System Design and Management Program
author2 Massachusetts Institute of Technology. Engineering and Management Program.
author_facet Massachusetts Institute of Technology. Engineering and Management Program.
Johnson, Thomas M. (Thomas Merle)
author Johnson, Thomas M. (Thomas Merle)
author_sort Johnson, Thomas M. (Thomas Merle)
title Managing discovered scope within hybrid agile stage-gate project delivery systems
title_short Managing discovered scope within hybrid agile stage-gate project delivery systems
title_full Managing discovered scope within hybrid agile stage-gate project delivery systems
title_fullStr Managing discovered scope within hybrid agile stage-gate project delivery systems
title_full_unstemmed Managing discovered scope within hybrid agile stage-gate project delivery systems
title_sort managing discovered scope within hybrid agile stage-gate project delivery systems
publisher Massachusetts Institute of Technology
publishDate 2021
url https://hdl.handle.net/1721.1/132885
work_keys_str_mv AT johnsonthomasmthomasmerle managingdiscoveredscopewithinhybridagilestagegateprojectdeliverysystems
_version_ 1719488465725292544
spelling ndltd-MIT-oai-dspace.mit.edu-1721.1-1328852021-10-10T05:07:30Z Managing discovered scope within hybrid agile stage-gate project delivery systems Johnson, Thomas M. (Thomas Merle) Massachusetts Institute of Technology. Engineering and Management Program. System Design and Management Program. Massachusetts Institute of Technology. Engineering and Management Program System Design and Management Program Engineering and Management Program. System Design and Management Program. Thesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, System Design and Management Program, February, 2021 Cataloged from the official version of thesis. Includes bibliographical references (pages 83-84). Complex mechatronic projects have machine functionality dependent upon substantial embedded software content delivered in coordination with the hardware componentry. This situation creates a dilemma for project leadership as they determine which methods to utilize for managing the project. One option is to utilize a hybrid approach where comingled Stage-Gate and Agile methods serve both hardware and software activities. However, the need for synchronized delivery schedules between the hardware and software components is not addressed well by Agile methods, which do not emphasize forward planning. In contrast, the uncertainty in defining software scope challenges the up-front scope definition relied upon by Stage-Gate methods. Three independently operating project delivery systems have each spent more than ten years weaving Agile software development methods into the classic Stage-Gate approaches to make their hybrid project management systems. This study interviews Agile and Stage-Gate leadership roles within each of these three project delivery systems to identify what has evolved to keep the schedule expectations for scope delivery aligned to the discovery of additional scope while software development progresses. This study finds that both the Stage-Gate and Agile leaders interviewed call for more work to be done in the project planning stage to improve the inclusion of more rigorous software scope identification activities. It also finds several differences in the design stage activities across the groups studied concerning how they accommodate the discovery of new software scope into the overall scope and schedule expectations for the project, each with a differing level of effectiveness. The most effective traits include the formalized identification and capture of the product decomposition and architecture so that it can be used to estimate software scope, schedule, and resources more accurately upfront in the planning stage. During the design stage, the most effective project delivery systems leverage the cultural acknowledgment and leadership's enforcement of the stakeholders' need to adjust their scope expectations in response to new scope discoveries. The addition of repeating two-month planning events deliver timely forecasts of software deliveries, and frequent scope management meetings allow for rapid adjustment to software scope discoveries. Each software delivery system added dedicated Software Delivery Lead roles to act as the liaison between the Agile and Stage-Gate management methods and to formulate mitigation activities with the rest of the functional area leads to the mechatronic product. Project delivery system developers may use these findings as a set of lessons learned to guide their pursuits with the integration of Agile practices into an existing Stage-Gate process. Others could build upon these findings by repeating the activity with other case studies to see if a pattern emerges, which could guide the creation of more specific Agile Stage-Gate frameworks. by Thomas M. Johnson. S.M. in Engineering and Management S.M.inEngineeringandManagement Massachusetts Institute of Technology, System Design and Management Program 2021-10-08T17:10:32Z 2021-10-08T17:10:32Z 2021 2021 Thesis https://hdl.handle.net/1721.1/132885 1263357264 eng MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided. http://dspace.mit.edu/handle/1721.1/7582 90 pages application/pdf Massachusetts Institute of Technology