Increasing the capacity of a flow shop : technical and organizational issues
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2001. === Includes bibliographical references (p. 70). === by Gavin...
Main Author: | DeNyse, Gavin J. (Gavin James), 1971- |
---|---|
Other Authors: | Stanley Gershwin and Janice Klein. |
Format: | Others |
Language: | English |
Published: |
Massachusetts Institute of Technology
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/88956 |
Similar Items
-
Impact of increased vehicle software content on automotive product development
by: Rabatin, Amy Elizabeth, 1971-
Published: (2014) -
Business expansion and lean transformation for helicopter blade shop
by: Bar, S. Neil (Saumen Neil)
Published: (2007) -
Scheduling and shop floor control in commercial airplane manufacturing
by: Sahney, Vikram Neal
Published: (2006) -
Strategies and processes for identifying and resolving throughput problems in an automotive paint shop
by: Harper, Kris R. (Kris Robert), 1975-
Published: (2014) -
Synchronous manufacturing : implementing "pull" production in a job shop environment
by: Schoch-Rodriguez, Malia (Malia Jean)
Published: (2007)