A practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment

Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2014. In conjunction with the Leaders for Global Operations Program at MIT. === Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014. In conjunction with the Leaders for Glob...

Full description

Bibliographic Details
Main Author: Wilson, Christopher J. (Christopher James)
Other Authors: Roy Welsch and Charles L. Cooney.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2014
Subjects:
Online Access:http://hdl.handle.net/1721.1/90750
id ndltd-MIT-oai-dspace.mit.edu-1721.1-90750
record_format oai_dc
spelling ndltd-MIT-oai-dspace.mit.edu-1721.1-907502019-05-02T16:07:37Z A practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment Wilson, Christopher J. (Christopher James) Roy Welsch and Charles L. Cooney. Leaders for Global Operations Program. Sloan School of Management. Massachusetts Institute of Technology. Department of Mechanical Engineering. Leaders for Global Operations Program. Sloan School of Management. Mechanical Engineering. Leaders for Global Operations Program. Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2014. In conjunction with the Leaders for Global Operations Program at MIT. Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014. In conjunction with the Leaders for Global Operations Program at MIT. Cataloged from PDF version of thesis. Includes bibliographical references (pages 55-56). In pursuit of Novartis Pharmaceutical's vision to "Make Quality Medicine-On Time, Every Time" Novartis Ringaskiddy Limited (NRL), is pursuing Class A Manufacturing (MRP II) certification. Achieving Class A certification requires production plans be established and met with great accuracy. The Multi Synthesis Production Unit (MSPU) at NRL sets rolling eighteen month production commitments on a semi-annual basis. During planning a rudimentary tool is used to allocate production campaigns for over 40 different Active Pharmaceutical Ingredients (API) and intermediate products across roughly 200 pieces of equipment. This manual tool is time intensive to operate, prone to errors, and requires extensive knowledge of the facility. To address this problem, a simulation based model was developed using the software package, SchedulePro". The aim of this project was to create a system to support more effective and reliable production planning. The approach requires accuracy in modeling, a process to deploy the tool and a connection to people who use and benefit from the process. In order to evaluate the proposed model and understand potential benefits to Novartis, five case studies are used to compare the proposed planning process with traditional methods. First, when planning a future production year the proposed planning process demonstrates a reduction in required time as well as an increase in accuracy. Second, when evaluating the response to a change in demand a user with little knowledge of the plant can attain comparable response time as an experienced user of traditional methods. Third, when faced with an unplanned equipment failure the user is able to explore alternative production plans which minimize disturbance to the established production plan. Fourth, through the evaluation of alternative resource allocation plans the user can determine the lowest cost approach. Finally, when applied to a product launch evaluation the model is shown to reduce the number of planning cycles, focusing specifically on the ability of the site to support a product launch in a previously allocated year. by Christopher J. Wilson. M.B.A. S.M. 2014-10-08T15:26:50Z 2014-10-08T15:26:50Z 2014 2014 Thesis http://hdl.handle.net/1721.1/90750 891366566 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 61 pages application/pdf Massachusetts Institute of Technology
collection NDLTD
language English
format Others
sources NDLTD
topic Sloan School of Management.
Mechanical Engineering.
Leaders for Global Operations Program.
spellingShingle Sloan School of Management.
Mechanical Engineering.
Leaders for Global Operations Program.
Wilson, Christopher J. (Christopher James)
A practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment
description Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2014. In conjunction with the Leaders for Global Operations Program at MIT. === Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014. In conjunction with the Leaders for Global Operations Program at MIT. === Cataloged from PDF version of thesis. === Includes bibliographical references (pages 55-56). === In pursuit of Novartis Pharmaceutical's vision to "Make Quality Medicine-On Time, Every Time" Novartis Ringaskiddy Limited (NRL), is pursuing Class A Manufacturing (MRP II) certification. Achieving Class A certification requires production plans be established and met with great accuracy. The Multi Synthesis Production Unit (MSPU) at NRL sets rolling eighteen month production commitments on a semi-annual basis. During planning a rudimentary tool is used to allocate production campaigns for over 40 different Active Pharmaceutical Ingredients (API) and intermediate products across roughly 200 pieces of equipment. This manual tool is time intensive to operate, prone to errors, and requires extensive knowledge of the facility. To address this problem, a simulation based model was developed using the software package, SchedulePro". The aim of this project was to create a system to support more effective and reliable production planning. The approach requires accuracy in modeling, a process to deploy the tool and a connection to people who use and benefit from the process. In order to evaluate the proposed model and understand potential benefits to Novartis, five case studies are used to compare the proposed planning process with traditional methods. First, when planning a future production year the proposed planning process demonstrates a reduction in required time as well as an increase in accuracy. Second, when evaluating the response to a change in demand a user with little knowledge of the plant can attain comparable response time as an experienced user of traditional methods. Third, when faced with an unplanned equipment failure the user is able to explore alternative production plans which minimize disturbance to the established production plan. Fourth, through the evaluation of alternative resource allocation plans the user can determine the lowest cost approach. Finally, when applied to a product launch evaluation the model is shown to reduce the number of planning cycles, focusing specifically on the ability of the site to support a product launch in a previously allocated year. === by Christopher J. Wilson. === M.B.A. === S.M.
author2 Roy Welsch and Charles L. Cooney.
author_facet Roy Welsch and Charles L. Cooney.
Wilson, Christopher J. (Christopher James)
author Wilson, Christopher J. (Christopher James)
author_sort Wilson, Christopher J. (Christopher James)
title A practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment
title_short A practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment
title_full A practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment
title_fullStr A practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment
title_full_unstemmed A practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment
title_sort practical application of simulation for production planning in a flexible pharmaceutical manufacturing environment
publisher Massachusetts Institute of Technology
publishDate 2014
url http://hdl.handle.net/1721.1/90750
work_keys_str_mv AT wilsonchristopherjchristopherjames apracticalapplicationofsimulationforproductionplanninginaflexiblepharmaceuticalmanufacturingenvironment
AT wilsonchristopherjchristopherjames practicalapplicationofsimulationforproductionplanninginaflexiblepharmaceuticalmanufacturingenvironment
_version_ 1719035026242273280