Preemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount

This paper considers the disassembly-to-order (DTO) problem where end-of-life (EOL) products are purchased for disassembly in order to satisfy the demand for specified numbers of components. Previous work in the literature solved the DTO problem with multiple uncertainties under a single objective w...

Full description

Bibliographic Details
Published:
Online Access:http://hdl.handle.net/2047/d20000253
id ndltd-NEU--neu-330928
record_format oai_dc
spelling ndltd-NEU--neu-3309282016-04-25T16:14:17ZPreemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discountThis paper considers the disassembly-to-order (DTO) problem where end-of-life (EOL) products are purchased for disassembly in order to satisfy the demand for specified numbers of components. Previous work in the literature solved the DTO problem with multiple uncertainties under a single objective while others solved the multi-criteria model with a single uncertainty. This paper develop a multi-criteria DTO model that would takes into consideration multiple system uncertainties and variability. The multi-criteria DTO model was solved using preemptive goal programming (PGP). The main objective was to determine optimal number of take-back EOL products in every period from each supplier in order to satisfy the demand of components and materials while trying to achieve the aspiration levels of multiple goals. A numerical example is considered to illustrate the model approach.http://hdl.handle.net/2047/d20000253
collection NDLTD
sources NDLTD
description This paper considers the disassembly-to-order (DTO) problem where end-of-life (EOL) products are purchased for disassembly in order to satisfy the demand for specified numbers of components. Previous work in the literature solved the DTO problem with multiple uncertainties under a single objective while others solved the multi-criteria model with a single uncertainty. This paper develop a multi-criteria DTO model that would takes into consideration multiple system uncertainties and variability. The multi-criteria DTO model was solved using preemptive goal programming (PGP). The main objective was to determine optimal number of take-back EOL products in every period from each supplier in order to satisfy the demand of components and materials while trying to achieve the aspiration levels of multiple goals. A numerical example is considered to illustrate the model approach.
title Preemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount
spellingShingle Preemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount
title_short Preemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount
title_full Preemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount
title_fullStr Preemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount
title_full_unstemmed Preemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount
title_sort preemptive goal programming for solving the multi-criteria disassembly-to-order problem under stochastic yields, limited supply, and quantity discount
publishDate
url http://hdl.handle.net/2047/d20000253
_version_ 1718235700498792448