Production model for the reduction of order delivery time in a peruvian metalworking company based on the six sigma dmaic methodology

El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado. === The present research work has as objective the application of Six Sigma DMAIC methodology in the production’s processes, the results will be manife...

Full description

Bibliographic Details
Main Authors: Espinoza-Cuadros, Anelit, Criollo Marcavillaca, Miriam, Mendoza-Vargas, Pablo, Alvarez, Jose
Format: Article
Language:English
Published: 2021
Subjects:
Online Access:http://hdl.handle.net/10757/656015
Description
Summary:El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado. === The present research work has as objective the application of Six Sigma DMAIC methodology in the production’s processes, the results will be manifested in increasing the efficiency of the production system and in reducing the delay in order delivery. In a metal mechanic company dedicated to the manufacture of electrical boards which focus is the terraced boards there was presented a fulfillment rate failure to deliver on time 46%. On the other hand, the delivery delay is generated because the current productivity does not supply what is required by the customer, therefore a minimum 394 units per month is needed to meet the requirements but currently only produce 226 units per month. For solve this problem it was proposed that Production model that merges the painting and baking areas and that generates an impact on the entire painting operation.