A Crew Scheduling System based on Constraint Logic Programming
碩士 === 國立臺灣大學 === 資訊工程研究所 === 81 === For most of the scheduling problems, they belong to the NP- problem. For example, crew scheduling, cabin crew scheduling and bus drivers assignment are all the scheduling problems. They are rather complicated and no s...
Main Authors: | Hu,Chih-Ching, 胡志青 |
---|---|
Other Authors: | Hsu,Ching-Chi |
Format: | Others |
Language: | zh-TW |
Published: |
1993
|
Online Access: | http://ndltd.ncl.edu.tw/handle/54350381689637390075 |
Similar Items
-
IMPLEMENTATION OF CONSTRAINT LOGIC PROGRAMMING ALGORITHM FOR GENERATOR MAINTENANCE SCHEDULING
by: Ching-Kuei Sung, et al.
Published: (1996) -
Applications of Constraint Programming and Mathematical Programming Techniques to Solve Large-Scale Cabin Crew Scheduling Problems
by: Kuo-Chen Wang, et al.
Published: (2002) -
Bus crew scheduling using mathematical programming
by: Smith, Barbara Mary
Published: (1986) -
The Study of Police Crews Scheduling problems
by: Chi-ping Lien, et al.
Published: (1999) -
A Method-Level Unit Testing Tool Based on Object Constraint Language and Constraint Logic Programming
by: Yi-Ting Hu, et al.
Published: (2010)