A Study on the Energy Dissipation Hexa-hallow Tri-leg Structure for the Scouring Hole of the Check Dam
碩士 === 國立中興大學 === 水土保持學類 === 84 === This study simulates the natural scouring hole and it' s depositing heap to use the hexa-hollow tri-leg structure as the apron of the check dams and to search the better way to...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Online Access: | http://ndltd.ncl.edu.tw/handle/03522284012025804910 |
id |
ndltd-TW-084NCHU0081003 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-084NCHU00810032016-02-05T04:16:17Z http://ndltd.ncl.edu.tw/handle/03522284012025804910 A Study on the Energy Dissipation Hexa-hallow Tri-leg Structure for the Scouring Hole of the Check Dam 防砂壩沖刷坑消能元鼎塊之試驗研究 Lee, Jung-Cho 李榮著 碩士 國立中興大學 水土保持學類 84 This study simulates the natural scouring hole and it' s depositing heap to use the hexa-hollow tri-leg structure as the apron of the check dams and to search the better way to place them. The experiment conducted under the non- sediment flow with fixed dam height of 15cm. Every way of laying the hexa-hollow tri-leg structure has four bed slopes and five discharges to test. And the last row of hexa-hollow tri-leg structure raised to be higher 2cm,4cm, and 6cm, respectively, than the original river bed. According to the results of experiments, we would find that the energy dissipation efficiency has a positive correlation with the bed slope,but a negative correlation with the discharge. For the residual energy on the end of hexa-hollow tri-leg structure, it happens to have the opposite situation. The influence of the different height of the last row of placed hexa-hollow tri-leg structure is nearly the same, but anyway, the rise of the last row structure is better. So we can consider to raise it properly. Tuan-Hao 段錦浩 學位論文 ; thesis 72 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立中興大學 === 水土保持學類 === 84 === This study simulates the natural scouring hole and it'
s depositing heap to use the hexa-hollow tri-leg structure
as the apron of the check dams and to search the better way
to place them. The experiment conducted under the non-
sediment flow with fixed dam height of 15cm. Every way of
laying the hexa-hollow tri-leg structure has four bed
slopes and five discharges to test. And the last row of
hexa-hollow tri-leg structure raised to be higher 2cm,4cm,
and 6cm, respectively, than the original river bed.
According to the results of experiments, we would find that
the energy dissipation efficiency has a positive correlation
with the bed slope,but a negative correlation with the
discharge. For the residual energy on the end of hexa-hollow
tri-leg structure, it happens to have the opposite situation.
The influence of the different height of the last row of
placed hexa-hollow tri-leg structure is nearly the same, but
anyway, the rise of the last row structure is better. So we
can consider to raise it properly.
|
author2 |
Tuan-Hao |
author_facet |
Tuan-Hao Lee, Jung-Cho 李榮著 |
author |
Lee, Jung-Cho 李榮著 |
spellingShingle |
Lee, Jung-Cho 李榮著 A Study on the Energy Dissipation Hexa-hallow Tri-leg Structure for the Scouring Hole of the Check Dam |
author_sort |
Lee, Jung-Cho |
title |
A Study on the Energy Dissipation Hexa-hallow Tri-leg Structure for the Scouring Hole of the Check Dam |
title_short |
A Study on the Energy Dissipation Hexa-hallow Tri-leg Structure for the Scouring Hole of the Check Dam |
title_full |
A Study on the Energy Dissipation Hexa-hallow Tri-leg Structure for the Scouring Hole of the Check Dam |
title_fullStr |
A Study on the Energy Dissipation Hexa-hallow Tri-leg Structure for the Scouring Hole of the Check Dam |
title_full_unstemmed |
A Study on the Energy Dissipation Hexa-hallow Tri-leg Structure for the Scouring Hole of the Check Dam |
title_sort |
study on the energy dissipation hexa-hallow tri-leg structure for the scouring hole of the check dam |
url |
http://ndltd.ncl.edu.tw/handle/03522284012025804910 |
work_keys_str_mv |
AT leejungcho astudyontheenergydissipationhexahallowtrilegstructureforthescouringholeofthecheckdam AT lǐróngzhe astudyontheenergydissipationhexahallowtrilegstructureforthescouringholeofthecheckdam AT leejungcho fángshābàchōngshuākēngxiāonéngyuándǐngkuàizhīshìyànyánjiū AT lǐróngzhe fángshābàchōngshuākēngxiāonéngyuándǐngkuàizhīshìyànyánjiū AT leejungcho studyontheenergydissipationhexahallowtrilegstructureforthescouringholeofthecheckdam AT lǐróngzhe studyontheenergydissipationhexahallowtrilegstructureforthescouringholeofthecheckdam |
_version_ |
1718179498982113280 |