The Planing and Design of a Prototype TCP/IP Based Flexible Manufacturing Simulation System

碩士 === 國立交通大學 === 控制工程系 === 84 === When buliding a flexible manufacturing system, first and most important step is to link each machine hardware interface through network. Then the second is to arrange the order of task for best perform...

Full description

Bibliographic Details
Main Authors: Wang, Sheng-Wen, 王興文
Other Authors: Pei-Chong Tang
Format: Others
Language:zh-TW
Published: 1996
Online Access:http://ndltd.ncl.edu.tw/handle/63253329877613314990

Similar Items