Good Quality Study For Engineering

碩士 === 國立中央大學 === 土木工程學系 === 85 === Quality in our construction work has long been criticized by the public, which gives a feeling that the cost do not really match the actual quality. What happens during the construction stage is a main factor. However,...

Full description

Bibliographic Details
Main Authors: KAO, SHOO-CHICH, 高守智
Other Authors: Hsieh Ting-Ya
Format: Others
Language:zh-TW
Published: 1997
Online Access:http://ndltd.ncl.edu.tw/handle/57487606350421793774
Description
Summary:碩士 === 國立中央大學 === 土木工程學系 === 85 === Quality in our construction work has long been criticized by the public, which gives a feeling that the cost do not really match the actual quality. What happens during the construction stage is a main factor. However, what is done during the design stage is even more of an important factor. But this has ordinarily been overlooked. Thus, the author is making an in-depth study from the standpoint of the clients, designers, as well as the contractors about the quality issue. So as to develop a new quality control method from the basic changes to practical operation, aiming to improve the construction quality and enhance the competitiveness.Good quality(GQ) is a change of way of thinking in management. It''s idea and promotion is firstly to make quality a habit in work, then transform it into a fact of life, so as to re-establish the direction in quality through basic improvement in the business.In this work, questionnaires to the contractors and visiting to the consulting firms, architectures, professional engineers, clients and investors have been made to understand the present condition of quality and bottlenecks in construction management. These are combined with the essence of TQM and ISO9000 and assisted with the author''s years of experience for the establishment of a quality control system suitable for domestic construction - "Good Quality(GQ)".This is to provide the business another way of thinking to improve the present condition in quality with practical operating methods, so as to lower the cost and shorten the duration for construction, improving their competitiveness for the challenge of an opened market.