An Application of Hierarchical Scheduling Algorithms
碩士 === 中原大學 === 工業工程研究所 === 86 === Scheduling research is important in both academia and industry. Unfortunately, in general, theoretical scheduling research cannot apply to industrial scheduling problems. Theoretical research makes oversimplified assumptions that cannot reflect realistic scheduling...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1998
|
Online Access: | http://ndltd.ncl.edu.tw/handle/95543657612538537228 |
id |
ndltd-TW-086CYCU0030011 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-086CYCU00300112016-01-22T04:17:05Z http://ndltd.ncl.edu.tw/handle/95543657612538537228 An Application of Hierarchical Scheduling Algorithms 階層式排程演算法之應用- Liu Beng-Neng 劉邦能 碩士 中原大學 工業工程研究所 86 Scheduling research is important in both academia and industry. Unfortunately, in general, theoretical scheduling research cannot apply to industrial scheduling problems. Theoretical research makes oversimplified assumptions that cannot reflect realistic scheduling constraints and developsover-complicated algorithms that are difficult to implement. This research proposes a hierarchical scheduling approach to solve an industrial scheduling problem in plastic tile manufacturers. Upper level scheduling assigns orders to different production lines and lower level scheduling determines the sequence of orders at each line. Realistic conditionsare taken into accounts: preventive maintenance, work calendar of machines, alternative routines, work-in-process, overtime capacity, bath size, ...etc. A prototype scheduling software is developed in Foxpro and industrial dataare used to test the performance of the scheduling algorithm. Simulation results show that the proposed hierarchical scheduling approach is effectiveand efficient. James C. Chen 陳建良 1998 學位論文 ; thesis 0 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中原大學 === 工業工程研究所 === 86 === Scheduling research is important in both academia and industry. Unfortunately, in general, theoretical scheduling research cannot apply to industrial scheduling problems. Theoretical research makes oversimplified assumptions that cannot reflect realistic scheduling constraints and developsover-complicated algorithms that are difficult to implement. This research proposes a hierarchical scheduling approach to solve an industrial scheduling problem in plastic tile manufacturers. Upper level scheduling assigns orders to different production lines and lower level scheduling determines the sequence of orders at each line. Realistic conditionsare taken into accounts: preventive maintenance, work calendar of machines, alternative routines, work-in-process, overtime capacity, bath size, ...etc. A prototype scheduling software is developed in Foxpro and industrial dataare used to test the performance of the scheduling algorithm. Simulation results show that the proposed hierarchical scheduling approach is effectiveand efficient.
|
author2 |
James C. Chen |
author_facet |
James C. Chen Liu Beng-Neng 劉邦能 |
author |
Liu Beng-Neng 劉邦能 |
spellingShingle |
Liu Beng-Neng 劉邦能 An Application of Hierarchical Scheduling Algorithms |
author_sort |
Liu Beng-Neng |
title |
An Application of Hierarchical Scheduling Algorithms |
title_short |
An Application of Hierarchical Scheduling Algorithms |
title_full |
An Application of Hierarchical Scheduling Algorithms |
title_fullStr |
An Application of Hierarchical Scheduling Algorithms |
title_full_unstemmed |
An Application of Hierarchical Scheduling Algorithms |
title_sort |
application of hierarchical scheduling algorithms |
publishDate |
1998 |
url |
http://ndltd.ncl.edu.tw/handle/95543657612538537228 |
work_keys_str_mv |
AT liubengneng anapplicationofhierarchicalschedulingalgorithms AT liúbāngnéng anapplicationofhierarchicalschedulingalgorithms AT liubengneng jiēcéngshìpáichéngyǎnsuànfǎzhīyīngyòng AT liúbāngnéng jiēcéngshìpáichéngyǎnsuànfǎzhīyīngyòng AT liubengneng applicationofhierarchicalschedulingalgorithms AT liúbāngnéng applicationofhierarchicalschedulingalgorithms |