Tin-based volume coputation for a reservoir

博士 === 國立交通大學 === 土木工程系所 === 86 === With the facilities and the efficiencies either in field work or in office work, cross-section method is a great favorite with surveyors in finding the capacity of a reservoir. Some of drawbacks existed in it, such as : lack of spot heights to depict the real topo...

Full description

Bibliographic Details
Main Authors: Huang Chong-Wei, 黃中偉
Other Authors: Shih Tian-Yuan
Format: Others
Language:zh-TW
Published: 1998
Online Access:http://ndltd.ncl.edu.tw/handle/37841110140410593739