Optimization of Fare for High Speed Rail System

碩士 === 國立臺灣大學 === 土木工程學研究所 === 87 === High speed rail (HSR) system is under development on the west corridor Taiwan by a build-operate-transfer (BOT) Approach. The concession company, Taiwan HSR company will have 35 years to build and operate the HSR system and would consider maximum profit as its...

Full description

Bibliographic Details
Main Authors: Lin I-Ting, 林億婷
Other Authors: Shyue-Koong Chang
Format: Others
Language:zh-TW
Published: 1999
Online Access:http://ndltd.ncl.edu.tw/handle/91480814282072266799
id ndltd-TW-087NTU00015118
record_format oai_dc
spelling ndltd-TW-087NTU000151182016-02-01T04:12:23Z http://ndltd.ncl.edu.tw/handle/91480814282072266799 Optimization of Fare for High Speed Rail System 高速鐵路最佳費率之研究 Lin I-Ting 林億婷 碩士 國立臺灣大學 土木工程學研究所 87 High speed rail (HSR) system is under development on the west corridor Taiwan by a build-operate-transfer (BOT) Approach. The concession company, Taiwan HSR company will have 35 years to build and operate the HSR system and would consider maximum profit as its main objective. However, the government would like to achieve the maximum social welfare objective with the mega-BOT project. It is desirable to understand effects of different fare schemes on the two objectives. This research applies analytic optimization approach to analyze optimal fare of the HSR system with objectives of the maximization of operator profit and social welfare. The study considers a distance-based fare structure, while considering logit model as the basis of demand model. Variable and capital cost are all be included in the cost function with a distance-based cost allocation method. The result of this research could provide information with which the HSR company can ensure its profitability while the government can have more reasonable regulation on the HSR pricing mechanism. Shyue-Koong Chang 張學孔 1999 學位論文 ; thesis 138 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 土木工程學研究所 === 87 === High speed rail (HSR) system is under development on the west corridor Taiwan by a build-operate-transfer (BOT) Approach. The concession company, Taiwan HSR company will have 35 years to build and operate the HSR system and would consider maximum profit as its main objective. However, the government would like to achieve the maximum social welfare objective with the mega-BOT project. It is desirable to understand effects of different fare schemes on the two objectives. This research applies analytic optimization approach to analyze optimal fare of the HSR system with objectives of the maximization of operator profit and social welfare. The study considers a distance-based fare structure, while considering logit model as the basis of demand model. Variable and capital cost are all be included in the cost function with a distance-based cost allocation method. The result of this research could provide information with which the HSR company can ensure its profitability while the government can have more reasonable regulation on the HSR pricing mechanism.
author2 Shyue-Koong Chang
author_facet Shyue-Koong Chang
Lin I-Ting
林億婷
author Lin I-Ting
林億婷
spellingShingle Lin I-Ting
林億婷
Optimization of Fare for High Speed Rail System
author_sort Lin I-Ting
title Optimization of Fare for High Speed Rail System
title_short Optimization of Fare for High Speed Rail System
title_full Optimization of Fare for High Speed Rail System
title_fullStr Optimization of Fare for High Speed Rail System
title_full_unstemmed Optimization of Fare for High Speed Rail System
title_sort optimization of fare for high speed rail system
publishDate 1999
url http://ndltd.ncl.edu.tw/handle/91480814282072266799
work_keys_str_mv AT liniting optimizationoffareforhighspeedrailsystem
AT línyìtíng optimizationoffareforhighspeedrailsystem
AT liniting gāosùtiělùzuìjiāfèilǜzhīyánjiū
AT línyìtíng gāosùtiělùzuìjiāfèilǜzhīyánjiū
_version_ 1718173868015747072